+EUROOPA PARLAMENDI JA NÕUKOGU MÄÄRUS (EÜ) nr 663/2009, 13. juuli 2009, millega luuakse abikava majanduse elavdamiseks ühenduse finantsabi andmisega energeetikaprojektidele
---+I PEATÜKK
------+Artikkel 1 Sisu
------+Artikkel 2 Mõisted
------+Artikkel 3 Eelarve
---------+Article 3 1.
---------+Article 3 2.
---------+Article 3 3.
---+II PEATÜKK
------+SECTION 1 Gas and electricity infrastructure projects
---------+Artikkel 4 Eesmärgid
---------+Artikkel 5 Prioriteedid
---------+Artikkel 6 Ühenduse finantsabi andmine
------------+Article 6 1.
------------+Article 6 2.
------------+Article 6 3.
---------+Artikkel 7 Abikõlblikkus
------------+Article 7 1.
------------+Article 7 2.
------------+Article 7 3.
---------+Artikkel 8 Valiku- ja lepingu sõlmimise kriteeriumid
------------+Article 8 1.
------------+Article 8 2.
---------+Artikkel 9 Rahastamistingimused
------------+Article 9 1.
------------+Article 9 2.
---------+Artikkel 10 Rahastamisvahendid
------------+Article 10 1.
------------+Article 10 2.
---------+Artikkel 11 Liikmesriikide finantskohustused
------------+Article 11 1.
------------+Article 11 2.
------+SECTION 2 Offshore wind projects
---------+Artikkel 12 EEPRi abi andmine
------------+Article 12 1.
------------+Article 12 2.
------------+Article 12 3.
---------+Artikkel 13 Abikõlblikkus
------------+Article 13 1.
------------+Article 13 2.
------------+Article 13 3.
---------+Artikkel 14 Valiku- ja lepingu sõlmimise kriteeriumid
------------+Article 14 1.
------------+Article 14 2.
---------+Artikkel 15 Rahastamistingimused
------------+Article 15 1.
------------+Article 15 2.
---------+Artikkel 16 Rahastamisvahendid
------------+Article 16 1.
------------+Article 16 2.
------+SECTION 3 Carbon capture and storage projects
---------+Artikkel 17 EEPRi abi andmine
------------+Article 17 1.
------------+Article 17 2.
------------+Article 17 3.
------------+Article 17 4.
---------+Artikkel 18 Abikõlblikkus
------------+Article 18 1.
------------+Article 18 2.
------------+Article 18 3.
---------+Artikkel 19 Valiku- ja lepingu sõlmimise kriteeriumid
------------+Article 19 1.
------------+Article 19 2.
---------+Artikkel 20 Rahastamistingimused
------------+Article 20 1.
------------+Article 20 2.
---------+Artikkel 21 Rahastamisvahendid
------------+Article 21 1.
------------+Article 21 2.
---+CHAPTER IIa FINANCIAL FACILITY
------+Artikkel 21a Rahalised vahendid, mida ei saa kohustustega siduda II peatüki raames
---------+Article 21a 1.
---------+Article 21a 2.
---------+Article 21a 3.
---+III PEATÜKK
------+Artikkel 23 Programmitöö ja rakendamise üksikasjad
---------+Article 23 1.
---------+Article 23 2.
---------+Article 23 2a.
---------+Article 23 3.
---------+Article 23 4.
------+Artikkel 24 Liikmesriikide üldised kohustused
------+Artikkel 25 Euroopa ühenduste finantshuvide kaitse
---------+Article 25 1.
---------+Article 25 2.
---------+Article 25 3.
---+IV PEATÜKK
------+Artikkel 26 Komiteed
---------+Article 26 1.
---------+Article 26 2.
------+Artikkel 27 Hindamine
---------+Article 27 1a.
---------+Article 27 2.
------+Artikkel 29 Jõustumine
---+►M1ANNEX I◄
---+ANNEX II FINANCIAL FACILITY
---+►M1 LISA ◄ ABIKÕLBLIKUD PROJEKTID A. Gaasi ja elektrienergia infrastruktuuri …
|
English -
European Union -
Energy -
EUROOPA PARLAMENDI JA NÕUKOGU MÄÄRUS (EÜ) nr 663/2009, 13. juuli 2009, millega luuakse abikava majanduse elavdamiseks ühenduse finantsabi andmisega energeetikaprojektidele
EUROOPA PARLAMENDI JA NÕUKOGU MÄÄRUS (EÜ) nr 663/2009, 13. juuli 2009, millega luuakse abikava majanduse elavdamiseks ühenduse finantsabi andmisega energeetikaprojektidele
1. Ülevaade
| Pealkiri |
Regulatsioon |
|
I PEATÜKK
|
I PEATÜKK
|
|
II PEATÜKK
|
II PEATÜKK
|
|
CHAPTER IIa FINANCIAL FACILITY
|
CHAPTER IIa FINANCIAL FACILITY
|
|
III PEATÜKK
|
III PEATÜKK
|
|
IV PEATÜKK
|
IV PEATÜKK
|
|
►M1ANNEX I◄
|
►M1
ANNEX I ◄
ELIGIBLE PROJECTS
A.
Gas and Electricity infrastructure projects
1. Gas interconnectors
|
Project
|
Location of projects supported
|
Envisaged Community contribution
(EUR million)
|
|
Southern Gas Corridor
|
|
NABUCCO
|
Austria, Hungary, Bulgaria, Germany, Romania
|
200
|
|
ITGI – Poseidon
|
Italy, Greece
|
100
|
|
Baltic interconnection
|
|
Skanled/Baltic pipe
|
Poland, Denmark, Sweden
|
150
|
|
LNG network
|
|
Liquefied Natural Gas terminal at Polish coast at port of Świnoujście
|
Poland
|
80
|
|
Central and South East Europe
|
|
Slovakia-Hungary Interconnector (Veľký Krtíš - Vecsés)
|
Slovakia, Hungary
|
30
|
|
Gas transmission system in Slovenia between the Austrian Border to Ljubljana (excluding the section Rogatec-Kidričevo)
|
Slovenia
|
40
|
|
Interconnection Bulgaria-Greece (Stara Zagora — Dimitrovgrad-Komotini)
|
Bulgaria, Greece
|
45
|
|
Romania-Hungary gas interconnector
|
Romania, Hungary
|
30
|
|
Expansion of Gas Storage Capacity in the Czech hub
|
Czech Republic
|
35
|
|
Infrastructure and equipment to permit reverse gas flow in the event of short term supply disruption
|
Austria, Bulgaria, Czech Republic, Estonia, Greece, Hungary, Latvia, Lithuania, Poland, Portugal, Romania, Slovakia
|
80
|
|
Slovakia-Poland interconnection
|
Slovakia, Poland
|
20
|
|
Hungary-Croatia interconnection
|
Hungary
|
20
|
|
Bulgaria-Romania interconnection
|
Bulgaria, Romania
|
10
|
|
Mediterranean
|
|
Reinforcement of FR gas network on the Africa-Spain-France axis
|
France
|
200
|
|
GALSI (Gazoduc Algérie-Italie)
|
Italy
|
120
|
|
Gas Interconnection Western Axis Larrau Branch
|
Spain
|
45
|
|
North Sea area
|
|
Germany-Belgium-United Kingdom pipeline
|
Belgium
|
35
|
|
France-Belgium connection
|
France, Belgium
|
200
|
|
TOTAL
|
|
1 440
|
2. Electricity interconnectors
|
Project
|
Location of projects supported
|
Envisaged Community contribution
(EUR million)
|
|
Baltic interconnection
|
|
Estlink-2
|
Estonia, Finland
|
100
|
|
Interconnection Sweden-Baltic States, and strengthening of the grid in Baltic States
|
Sweden, Latvia, Lithuania
|
175
|
|
Central and South East Europe
|
|
Halle/Saale – Schweinfurt
|
Germany
|
100
|
|
Wien-Győr
|
Austria, Hungary
|
20
|
|
Mediterranean
|
|
Portugal-Spain interconnection reinforcement
|
Portugal
|
50
|
|
Interconnection France-Spain (Baixas - Sta Llogaia)
|
France, Spain
|
225
|
|
New 380 kV AC submarine cable between Sicily – Continental Italy (Sorgente – Rizziconi)
|
Italy
|
110
|
|
North Sea area
|
|
500 MW Ireland/Wales interconnector (Meath-Deeside)
|
Ireland, United Kingdom
|
110
|
|
Electricity interconnection Malta-Italy
|
Malta/Italy
|
20
|
|
TOTAL
|
|
910
|
3. Small island projects
|
Small isolated island initiatives
|
Cyprus
|
10
|
|
Malta
|
5
|
|
TOTAL
|
|
15
|
B.
Offshore wind projects
|
Project
|
Capacity
|
Location of projects supported
|
Envisaged Community contribution
(EUR million)
|
|
1. Grid integration of offshore wind energy
|
|
1.1. Baltic – Kriegers Flak I, II, III
Building on projects under development. Financing aimed at ensuring extra cost for securing a joint interconnection solution.
|
1,5 GW
|
Denmark, Sweden, Germany, Poland
|
150
|
|
1.2. North sea grid
Modular development of offshore grid, demonstration of virtual offshore power plant and integration in the existing onshore grid system.
|
1 GW
|
United Kingdom, Netherlands, Germany, Ireland, Denmark, Belgium, France, Luxembourg
|
165
|
|
2. New turbines, structures and components, optimisation of manufacturing capacities
|
|
2.1. Borkum West II – Bard 1 – Nordsee Ost – Global Tech I
New generation of multi-megawatt size turbines (5-7 MW) and innovative structures, situated far from shore (up to 100 km) in deeper waters (up to 40 m).
|
1,6 GW
|
Germany
|
200
|
|
2.2. Aberdeen offshore wind farm (European testing centre)
Building on project presently under development – testing of multi-MW turbines. Development of innovative structures and substructures including optimisation of manufacturing capacities of offshore wind energy production equipment. An increase in size of 100 MW can be envisaged.
|
0,25 GW
|
United Kingdom
|
40
|
|
2.3. Thornton Bank
Building on project presently under development. Learning from the Downvind project (cofinanced through FP6). Upscaling the Downvind installations turbines (5 MW size) in deep waters (up to 30 m) with low visual impact (up to 30 km).
|
90 MW
|
Belgium
|
10
|
|
TOTAL
|
|
|
565
|
C.
Carbon capture and storage projects
|
Project Name/Location
|
Envisaged Community contribution
(EUR million)
|
Fuel
|
Capacity
|
Capture Technique
|
Storage Concept
|
|
Huerth
|
Germany
|
180
|
Coal
|
450 MW
|
IGCC
|
Saline Aquifer
|
|
Jaenschwalde
|
|
|
Coal
|
500 MW
|
Oxyfuel
|
Oil/Gas fields
|
|
Eemshaven
|
Netherlands
|
180
|
Coal
|
1 200 MW
|
IGCC
|
Oil/Gas fields
|
|
Rotterdam
|
Coal
|
1 080 MW
|
PC
|
Oil/Gas fields
|
|
Rotterdam
|
Coal
|
800 MW
|
PC
|
Oil/Gas fields
|
|
Bełchatów
|
Poland
|
180
|
Coal
|
858 MW
|
PC
|
Saline Aquifer
|
|
Compostilla
(León)
|
Spain
|
180
|
Coal
|
500 MW
|
Oxyfuel
|
Saline Aquifer
|
|
Kingsnorth
|
United Kingdom
|
180
|
Coal
|
800 MW
|
PC
|
Oil/Gas fields
|
|
Longannet
|
Coal
|
3 390 MW
|
PC
|
Saline Aquifer
|
|
Tilbury
|
Coal
|
1 600 MW
|
PC
|
Oil/Gas fields
|
|
Hatfield
(Yorkshire)
|
Coal
|
900 MW
|
IGCC
|
Oil/Gas fields
|
|
Porto Tolle
|
Italy
|
100
|
Coal
|
660 MW
|
PC
|
|
|
Industrial carbon capture project
|
|
Florange
|
France
|
50
|
Transport of CO2 from industrial installation (steel plant) to underground storage (saline aquifer)
|
|
TOTAL
|
1 050
|
|
|
ANNEX II FINANCIAL FACILITY
|
ANNEX II
FINANCIAL FACILITY
A.
Implementation of the financial facility for sustainable energy projects
1.
Scope of the facility
The financial facility (the facility) shall be used for the development of energy saving, energy efficiency and renewable energy projects and shall facilitate the financing of investments in those areas by local, regional and, in duly justified cases, national public authorities. The facility shall be implemented in accordance with the provisions on the delegation of budgetary execution tasks laid down in the Financial Regulation and its implementing rules.
The facility shall be used for sustainable energy projects, in particular in urban settings. This shall include, in particular, projects concerning:
(a)
public and private buildings incorporating energy efficiency and/or renewable energy solutions including those based on the usage of Information and Communication Technologies (ICT);
(b)
investments in high energy efficient combined heat and power (CHP), including micro-cogeneration, and district heating/cooling networks, in particular from renewable energy sources;
(c)
decentralised renewable energy sources embedded in local settings and their integration in electricity grids;
(d)
microgeneration from renewable energy sources;
(e)
clean urban transport to support increased energy efficiency and integration of renewable energy sources, with an emphasis on public transport, electric and hydrogen vehicles and reduced greenhouse gas emissions;
(f)
local infrastructure, including efficient lighting of outdoor public infrastructure such as street lighting, electricity storage solutions, smart metering, and smart grids, that make full usage of ICT;
(g)
energy efficiency and renewable energy technologies with innovation and economic potential using the best available procedures.
The facility may be also used to provide incentives and technical assistance as well as to raise the awareness of local, regional and national authorities so as to ensure optimal use of the Structural and Cohesion Funds, in particular in the areas of energy efficiency and renewable energy improvements in housing and other types of buildings. The facility shall sustain investment projects demonstrating an economic and financial viability, in order to refund the investments allocated by the facility and to attract public and private investments. Thus, the facility may, inter alia, include provisioning and capital allocation for loans, guarantees, equity and other financial products. Furthermore, up to 15 % of the funding referred to in Article 21a may be used to provide technical assistance to local, regional or national, authorities on the setting up of, and on the initial deployment phase of technology related to, energy efficiency and renewable energy projects.
2.
Synergies
When granting financial or technical assistance, attention shall also be paid to synergies with other financial resources available in the Member States, such as the Structural and Cohesion Funds and the ELENA Facility, in order to avoid overlaps with other instruments.
3.
Beneficiaries
The beneficiaries of the facility shall be public authorities, preferably at local and regional level, and public or private entities acting on behalf of those public authorities.
B.
Cooperation with financial intermediaries
1.
Selection and general requirements, including costs
The facility shall be set up in cooperation with one or more financial intermediaries, and shall be open to participation by appropriate investors. The selection of the financial intermediaries shall take place on the basis of their demonstrated ability to use the funding in the most efficient and effective way, in accordance with the rules and criteria set out in this Annex.
The Commission shall ensure that the total amount of overhead costs related to the establishment and implementation of the facility, including management fees and other eligible costs invoiced by the financial intermediaries, remains as limited as possible, in line with best practice for similar instruments and whilst safeguarding the required quality of the facility.
The Union contribution to the facility shall be implemented by the Commission in accordance with the provisions set out in Articles 53 and 54 of the Financial Regulation.
The financial intermediaries shall comply with the relevant requirements on the delegation of budgetary execution tasks set out in the Financial Regulation and its implementing rules, in particular as regards procurement rules, internal control, accounting and external audit. No funding other than management fees or costs related to the establishment and implementation of the facility shall be made available to those financial intermediaries.
The detailed terms and conditions of the establishment and the framework conditions of the facility, including monitoring and control, shall be laid down in one or more agreements between the Commission and the financial intermediaries.
2.
Availability of information
The facility shall make available online all information on programme management that is relevant for interested parties. This shall include, notably, application procedures, information on best practices and an overview of projects and reports.
C.
Funding conditions and eligibility and selection criteria
1.
Scope of financing
In accordance with this Annex, the facility shall be limited to the financing of:
(a)
investment projects that have a rapid, measurable and substantial impact on economic recovery within the Union, increased energy security and the reduction in greenhouse gas emissions; and
(b)
technical assistance for energy efficiency and renewable energy projects.
2.
Factors to be taken into account
As regards the selection of projects, particular attention shall be paid to the geographical balance.
As regards the financing of investment projects, due attention shall be paid to reaching a significant leverage factor between the total investment and the Union funding in order to raise significant investments in the Union. However, the leverage factor for individual investment projects may vary, depending on a number of factors such as the actual size and type of a project and on local conditions including the size and financial capabilities of the beneficiary.
3.
Conditions for public authorities’ access to financing under the facility
Public authorities requesting financing for investment projects or technical assistance for energy efficiency and renewable energy projects shall comply with the following conditions:
(a)
they have made, or are in the process of making, a political commitment to mitigate climate change, where appropriate including concrete objectives, for example relating to increasing energy efficiency and/or the use of energy from renewable sources;
(b)
they are either working towards developing multi-annual strategies to mitigate climate change and, where appropriate, to attain their objectives, or are participating in a multi-annual strategy at local, regional or national level to mitigate climate change;
(c)
they agree to be publicly accountable for the progress in their overall strategy.
4.
Eligibility and selection criteria for investment projects financed under the facility
Investment projects financed under the facility shall comply with the following eligibility and selection criteria:
(a)
the soundness and technical adequacy of the approach;
(b)
the soundness and cost effectiveness of the funding for the full investment phase of the action;
(c)
the geographical balance of all projects covered by this Regulation;
(d)
maturity, defined as reaching the investment stage, and incurring substantial capital expenditure as soon as possible;
(e)
the extent to which lack of access to finance is delaying the implementation of the action;
(f)
the extent to which funding from the facility will stimulate public and private finance;
(g)
quantified socioeconomic impacts;
(h)
quantified environmental impacts.
5.
Eligibility and selection criteria for technical assistance projects financed under the facility
Technical assistance projects financed under the facility shall comply with the eligibility and selection criteria referred to in point 4(a), (c), (e), (f) and (g).
|
|
►M1 LISA ◄ ABIKÕLBLIKUD PROJEKTID A. Gaasi ja elektrienergia infrastruktuuri …
|
►M1
LISA
◄
ABIKÕLBLIKUD PROJEKTID
A.
Gaasi ja elektrienergia infrastruktuuri projektid
1. Gaasivõrkude ühendamine
|
Projekt
|
Toetust saava projekti asukoht
|
Ühenduse kavandatud panus
(miljonit eurot)
|
|
Lõuna-Euroopa gaasitranspordikoridor
|
|
NABUCCO
|
Austria, Ungari, Bulgaaria, Saksamaa, Rumeenia
|
200
|
|
ITGI – Poseidon
|
Itaalia, Kreeka
|
100
|
|
Balti riikide võrkude ühendamine
|
|
Skanled/Balti gaasijuhe
|
Poola, Taani, Rootsi
|
150
|
|
Veeldatud maagaas
|
|
Veeldatud maagaasi terminal Poola rannikul Świnoujście sadamas
|
Poola
|
80
|
|
Kesk- ja Kagu-Euroopa
|
|
Slovakkia ja Ungari võrkude ühendamine (Veľký Krtíš – Vecsés)
|
Slovakkia, Ungari
|
30
|
|
Gaasiedastussüsteem Sloveenias Austria piiri ja Ljubljana vahel (v.a Rogateci–Kidričevo lõik)
|
Sloveenia
|
40
|
|
Bulgaaria ja Kreeka võrkude ühendamine (Stara Zagora – Dimitrovgrad-Komotini)
|
Bulgaaria, Kreeka
|
45
|
|
Rumeenia ja Ungari gaasivõrkude ühendamine
|
Rumeenia, Ungari
|
30
|
|
Tšehhi gaasikeskuse ladustamisvõimsuse suurendamine
|
Tšehhi Vabariik
|
35
|
|
Lühiajalise tarnehäire korral vastassuunas gaasi juurdevoolu võimaldavad seadmed ja infrastruktuur
|
Austria, Bulgaaria, Tšehhi Vabariik, Eesti, Kreeka, Ungari, Läti, Leedu, Poola, Portugal, Rumeenia, Slovakkia
|
80
|
|
Slovakkia ja Poola võrkude ühendamine
|
Slovakkia, Poola
|
20
|
|
Ungari ja Horvaatia võrkude ühendamine
|
Ungari
|
20
|
|
Bulgaaria ja Rumeenia võrkude ühendamine
|
Bulgaaria, Rumeenia
|
10
|
|
Vahemere piirkond
|
|
Prantsusmaa gaasivõrgu tugevdamine teljel Aafrika–Hispaania–Prantsusmaa
|
Prantsusmaa
|
200
|
|
GALSI (Gazoduc Algérie-Italie)
|
Itaalia
|
120
|
|
Gaasivõrkude ühendamine, läänetelg, Larrau haru
|
Hispaania
|
45
|
|
Põhjamere piirkond
|
|
Saksamaa–Belgia–Ühendkuningriigi torujuhe
|
Belgia
|
35
|
|
Prantsusmaa ja Belgia vaheline ühendus
|
Prantsusmaa, Belgia
|
200
|
|
KOKKU
|
|
1 440
|
2. Elektrivõrkude ühendamine
|
Projekt
|
Toetust saava projekti asukoht
|
Ühenduse kavandatud panus
(miljonit eurot)
|
|
Balti riikide võrkude ühendamine
|
|
Estlink-2
|
Eesti, Soome
|
100
|
|
Rootsi ja Balti riikide võrkude ühendamine ning Balti ringi tugevdamine
|
Rootsi, Läti, Leedu
|
175
|
|
Kesk- ja Kagu-Euroopa
|
|
Halle/Saale – Schweinfurt
|
Saksamaa
|
100
|
|
Wien–Győr
|
Austria, Ungari
|
20
|
|
Vahemere piirkond
|
|
Portugali ja Hispaania ühenduse tugevdamine
|
Portugal
|
50
|
|
Prantsusmaa ja Hispaania võrkude ühendamine (Baixas – Sta Llogaia)
|
Prantsusmaa, Hispaania
|
225
|
|
Uus merealune vahelduvvoolu-kõrgepingekaabel (380 kV) Sitsiilia ja Itaalia mandriosa vahel (Sorgente–Rizziconi)
|
Itaalia
|
110
|
|
Põhjamere piirkond
|
|
Iirimaa ja Walesi võrkude ühendamine (500 MW) (Meath–Deeside)
|
Iirimaa, Ühendkuningriik
|
110
|
|
Malta ja Itaalia elektrivõrkude ühendamine
|
Malta, Itaalia
|
20
|
|
KOKKU
|
|
910
|
3. Väikesaarte projektid
|
Väikesi eraldatud saari käsitlevad algatused
|
Küpros
|
10
|
|
Malta
|
5
|
|
KOKKU
|
|
15
|
B.
Avamere tuuleenergia projektid
|
Projekt
|
Võimsus
|
Toetust saava projekti asukoht
|
Ühenduse kavandatud panus
(miljonit eurot)
|
|
1. Avamere tuuleenergia sidumine võrku
|
|
1.1. Baltic – Kriegers Flak I, II, III
Töös olevate projektide edasiarendamine. Rahastamine, mis on suunatud ühendamise ühislahenduse väljatöötamisega kaasnevate lisakulude katmisele.
|
1,5 GW
|
Taani, Rootsi, Saksamaa, Poola
|
150
|
|
1.2. Põhjamere võrk
Avamerevõrgu mooduli väljatöötamine, virtuaalse avamere elektrijaama katsetamine ja ühendamine olemasoleva maismaavõrguga.
|
1 GW
|
Ühendkuningriik, Madalmaad, Saksamaa, Iirimaa, Taani, Belgia, Prantsusmaa, Luksemburg
|
165
|
|
2. Uued tuuleturbiinid, konstruktsioonid ja komponendid, tootmisvõimsuse optimeerimine
|
|
2.1. Borkum West II – Bard 1 – Nordsee Ost – Global Tech I
Uue põlvkonna mitmemegavatise võimsusega turbiinid (5–7 MW) ja uuenduslikud konstruktsioonid, mis asuvad kaldast kaugel (kuni 100 km) ja sügavamas vees (kuni 40 m).
|
1,6 GW
|
Saksamaa
|
200
|
|
2.2. Aberdeeni avamere tuulepark (Euroopa katsekeskus)
Töös olevate projektide edasiarendamine. Mitmemegavatiste turbiinide katsetamine. Uuenduslike konstruktsioonide ja konstruktsiooniosade väljatöötamine, sealhulgas avamere tuuleenergia tootmiseks vajalike seadmete tootmisvõimsuse optimeerimine. Kõne alla võib tulla võimsuse suurendamine 100 MW võrra.
|
0,25 GW
|
Ühendkuningriik
|
40
|
|
2.3. Thornton Bank
Töös oleva projekti edasiarendamine. Kuuenda raamprogrammi vahenditest kaasrahastatud Downvind (Distant Offshore Windfarms with No Visual Impact in Deepwater) projekti kogemustest järelduste tegemine. Downvindi süvavees asuva (kuni 30 m) vähese visuaalse mõjuga (kuni 30 km) katserajatise turbiinide (5 MW) võimsuse suurendamine.
|
90 MW
|
Belgia
|
10
|
|
KOKKU
|
|
|
565
|
C.
Süsinikdioksiidi kogumist ja säilitamist käsitlevad projektid
|
Projekti nimi/asukoht
|
Ühenduse kavandatud panus
(miljonit eurot)
|
Kütus
|
Võimsus
|
Kogumistehnoloogia
|
Säilitamiskoht
|
|
Huerth
|
Saksamaa
|
180
|
Süsi
|
450 MW
|
integreeritud gaasistusseadmega kombitsükkel
|
soolased põhjaveekihid
|
|
Jaenschwalde
|
|
|
Süsi
|
500 MW
|
hapnikuga põletamine
|
tühjakspumbatud nafta- ja gaasiväljad
|
|
Eemshaven
|
Madalmaad
|
180
|
Süsi
|
1 200 MW
|
integreeritud gaasistusseadmega kombitsükkel
|
tühjakspumbatud nafta- ja gaasiväljad
|
|
Rotterdam
|
Süsi
|
1 080 MW
|
tolmpõletus (pulverized combustion – PC)
|
tühjakspumbatud nafta- ja gaasiväljad
|
|
Rotterdam
|
Süsi
|
800 MW
|
tolmpõletus (pulverized combustion – PC)
|
tühjakspumbatud nafta- ja gaasiväljad
|
|
Belchatów
|
Poola
|
180
|
Süsi
|
858 MW
|
tolmpõletus (pulverized combustion – PC)
|
soolased põhjaveekihid
|
|
Compostilla
(León)
|
Hispaania
|
180
|
Süsi
|
500 MW
|
hapnikuga põletamine
|
soolased põhjaveekihid
|
|
Kingsnorth
|
Ühendkuningriik
|
180
|
Süsi
|
800 MW
|
tolmpõletus (pulverized combustion – PC)
|
tühjakspumbatud nafta- ja gaasiväljad
|
|
Longannet
|
Süsi
|
3 390 MW
|
tolmpõletus (pulverized combustion – PC)
|
soolased põhjaveekihid
|
|
Tilbury
|
Süsi
|
1 600 MW
|
tolmpõletus (pulverized combustion – PC)
|
tühjakspumbatud nafta- ja gaasiväljad
|
|
Hatfield
(Yorkshire)
|
Süsi
|
900 MW
|
integreeritud gaasistusseadmega kombitsükkel
|
tühjakspumbatud nafta- ja gaasiväljad
|
|
Porto Tolle
|
Itaalia
|
100
|
Süsi
|
660 MW
|
tolmpõletus (pulverized combustion – PC)
|
|
|
Tööstusliku süsiniku kogumise projekt
|
|
Florange
|
Prantsusmaa
|
50
|
CO2 transport tööstusseadmest (terasetehas) maa-alusesse säilitamiskohta (soolased põhjaveekihid)
|
|
KOKKU
|
1 050
|
▼M1
|
,
1.1 Viited
1.2 Tuvastatud nõuded
1.3 Seotud standardid
2. Tuvastatud nõuded
3. Seotud standardid
|