+EUROPOS PARLAMENTO IR TARYBOS REGLAMENTAS (EB) Nr. 663/2009 2009 m. liepos 13 d. dėl ekonomikos gaivinimo, teikiant Bendrijos finansinę paramą energetikos srities projektams, programos sukūrimo
---+I SKYRIUS
------+1 straipsnis Dalykas
------+2 straipsnis Sąvokų apibrėžtys
------+3 straipsnis Biudžetas
---------+Article 3 1.
---------+Article 3 2.
---------+Article 3 3.
---+II SKYRIUS
------+SECTION 1 Gas and electricity infrastructure projects
---------+4 straipsnis Tikslai
---------+5 straipsnis Prioritetai
---------+6 straipsnis Bendrijos finansinės paramos teikimas
------------+Article 6 1.
------------+Article 6 2.
------------+Article 6 3.
---------+7 straipsnis Atitiktis finansavimo reikalavimams
------------+Article 7 1.
------------+Article 7 2.
------------+Article 7 3.
---------+8 straipsnis Atrankos ir finansavimo skyrimo kriterijai
------------+Article 8 1.
------------+Article 8 2.
---------+9 straipsnis Finansavimo sąlygos
------------+Article 9 1.
------------+Article 9 2.
---------+10 straipsnis Priemonės
------------+Article 10 1.
------------+Article 10 2.
---------+11 straipsnis Valstybių narių finansiniai įsipareigojimai
------------+Article 11 1.
------------+Article 11 2.
------+SECTION 2 Offshore wind projects
---------+12 straipsnis EEPEG paramos teikimas
------------+Article 12 1.
------------+Article 12 2.
------------+Article 12 3.
---------+13 straipsnis Atitiktis finansavimo reikalavimams
------------+Article 13 1.
------------+Article 13 2.
------------+Article 13 3.
---------+14 straipsnis Atrankos ir finansavimo skyrimo kriterijai
------------+Article 14 1.
------------+Article 14 2.
---------+15 straipsnis Finansavimo sąlygos
------------+Article 15 1.
------------+Article 15 2.
---------+16 straipsnis Priemonės
------------+Article 16 1.
------------+Article 16 2.
------+SECTION 3 Carbon capture and storage projects
---------+17 straipsnis EEPEG paramos teikimas
------------+Article 17 1.
------------+Article 17 2.
------------+Article 17 3.
------------+Article 17 4.
---------+18 straipsnis Atitiktis finansavimo reikalavimams
------------+Article 18 1.
------------+Article 18 2.
------------+Article 18 3.
---------+19 straipsnis Atrankos ir finansavimo skyrimo kriterijai
------------+Article 19 1.
------------+Article 19 2.
---------+20 straipsnis Finansavimo sąlygos
------------+Article 20 1.
------------+Article 20 2.
---------+21 straipsnis Priemonės
------------+Article 21 1.
------------+Article 21 2.
---+CHAPTER IIa FINANCIAL FACILITY
------+21a straipsnis Lėšos, kurių negalima paskirstyti pagal II skyrių
---------+Article 21a 1.
---------+Article 21a 2.
---------+Article 21a 3.
---+III SKYRIUS
------+23 straipsnis Programavimo ir įgyvendinimo susitarimai
---------+Article 23 1.
---------+Article 23 2.
---------+Article 23 2a.
---------+Article 23 3.
---------+Article 23 4.
------+24 straipsnis Valstybių narių bendrieji įsipareigojimai
------+25 straipsnis Europos Bendrijų finansinių interesų apsauga
---------+Article 25 1.
---------+Article 25 2.
---------+Article 25 3.
---+IV SKYRIUS
------+26 straipsnis Komitetai
---------+Article 26 1.
---------+Article 26 2.
------+27 straipsnis Įvertinimas
---------+Article 27 1a.
---------+Article 27 2.
------+29 straipsnis Įsigaliojimas
---+►M1ANNEX I◄
---+ANNEX II FINANCIAL FACILITY
---+►M1 PRIEDAS ◄ FINANSAVIMO REIKALAVIMUS ATITINKANTYS PROJEKTAI A. Dujos ir …
|
English -
European Union -
Energy -
EUROPOS PARLAMENTO IR TARYBOS REGLAMENTAS (EB) Nr. 663/2009 2009 m. liepos 13 d. dėl ekonomikos gaivinimo, teikiant Bendrijos finansinę paramą energetikos srities projektams, programos sukūrimo
EUROPOS PARLAMENTO IR TARYBOS REGLAMENTAS (EB) Nr. 663/2009 2009 m. liepos 13 d. dėl ekonomikos gaivinimo, teikiant Bendrijos finansinę paramą energetikos srities projektams, programos sukūrimo
1. Apžvalga
| Pavadinimas |
Reguliavimas |
|
I SKYRIUS
|
I SKYRIUS
|
|
II SKYRIUS
|
II SKYRIUS
|
|
CHAPTER IIa FINANCIAL FACILITY
|
CHAPTER IIa FINANCIAL FACILITY
|
|
III SKYRIUS
|
III SKYRIUS
|
|
IV SKYRIUS
|
IV SKYRIUS
|
|
►M1ANNEX I◄
|
►M1
ANNEX I ◄
ELIGIBLE PROJECTS
A.
Gas and Electricity infrastructure projects
1. Gas interconnectors
|
Project
|
Location of projects supported
|
Envisaged Community contribution
(EUR million)
|
|
Southern Gas Corridor
|
|
NABUCCO
|
Austria, Hungary, Bulgaria, Germany, Romania
|
200
|
|
ITGI – Poseidon
|
Italy, Greece
|
100
|
|
Baltic interconnection
|
|
Skanled/Baltic pipe
|
Poland, Denmark, Sweden
|
150
|
|
LNG network
|
|
Liquefied Natural Gas terminal at Polish coast at port of Świnoujście
|
Poland
|
80
|
|
Central and South East Europe
|
|
Slovakia-Hungary Interconnector (Veľký Krtíš - Vecsés)
|
Slovakia, Hungary
|
30
|
|
Gas transmission system in Slovenia between the Austrian Border to Ljubljana (excluding the section Rogatec-Kidričevo)
|
Slovenia
|
40
|
|
Interconnection Bulgaria-Greece (Stara Zagora — Dimitrovgrad-Komotini)
|
Bulgaria, Greece
|
45
|
|
Romania-Hungary gas interconnector
|
Romania, Hungary
|
30
|
|
Expansion of Gas Storage Capacity in the Czech hub
|
Czech Republic
|
35
|
|
Infrastructure and equipment to permit reverse gas flow in the event of short term supply disruption
|
Austria, Bulgaria, Czech Republic, Estonia, Greece, Hungary, Latvia, Lithuania, Poland, Portugal, Romania, Slovakia
|
80
|
|
Slovakia-Poland interconnection
|
Slovakia, Poland
|
20
|
|
Hungary-Croatia interconnection
|
Hungary
|
20
|
|
Bulgaria-Romania interconnection
|
Bulgaria, Romania
|
10
|
|
Mediterranean
|
|
Reinforcement of FR gas network on the Africa-Spain-France axis
|
France
|
200
|
|
GALSI (Gazoduc Algérie-Italie)
|
Italy
|
120
|
|
Gas Interconnection Western Axis Larrau Branch
|
Spain
|
45
|
|
North Sea area
|
|
Germany-Belgium-United Kingdom pipeline
|
Belgium
|
35
|
|
France-Belgium connection
|
France, Belgium
|
200
|
|
TOTAL
|
|
1 440
|
2. Electricity interconnectors
|
Project
|
Location of projects supported
|
Envisaged Community contribution
(EUR million)
|
|
Baltic interconnection
|
|
Estlink-2
|
Estonia, Finland
|
100
|
|
Interconnection Sweden-Baltic States, and strengthening of the grid in Baltic States
|
Sweden, Latvia, Lithuania
|
175
|
|
Central and South East Europe
|
|
Halle/Saale – Schweinfurt
|
Germany
|
100
|
|
Wien-Győr
|
Austria, Hungary
|
20
|
|
Mediterranean
|
|
Portugal-Spain interconnection reinforcement
|
Portugal
|
50
|
|
Interconnection France-Spain (Baixas - Sta Llogaia)
|
France, Spain
|
225
|
|
New 380 kV AC submarine cable between Sicily – Continental Italy (Sorgente – Rizziconi)
|
Italy
|
110
|
|
North Sea area
|
|
500 MW Ireland/Wales interconnector (Meath-Deeside)
|
Ireland, United Kingdom
|
110
|
|
Electricity interconnection Malta-Italy
|
Malta/Italy
|
20
|
|
TOTAL
|
|
910
|
3. Small island projects
|
Small isolated island initiatives
|
Cyprus
|
10
|
|
Malta
|
5
|
|
TOTAL
|
|
15
|
B.
Offshore wind projects
|
Project
|
Capacity
|
Location of projects supported
|
Envisaged Community contribution
(EUR million)
|
|
1. Grid integration of offshore wind energy
|
|
1.1. Baltic – Kriegers Flak I, II, III
Building on projects under development. Financing aimed at ensuring extra cost for securing a joint interconnection solution.
|
1,5 GW
|
Denmark, Sweden, Germany, Poland
|
150
|
|
1.2. North sea grid
Modular development of offshore grid, demonstration of virtual offshore power plant and integration in the existing onshore grid system.
|
1 GW
|
United Kingdom, Netherlands, Germany, Ireland, Denmark, Belgium, France, Luxembourg
|
165
|
|
2. New turbines, structures and components, optimisation of manufacturing capacities
|
|
2.1. Borkum West II – Bard 1 – Nordsee Ost – Global Tech I
New generation of multi-megawatt size turbines (5-7 MW) and innovative structures, situated far from shore (up to 100 km) in deeper waters (up to 40 m).
|
1,6 GW
|
Germany
|
200
|
|
2.2. Aberdeen offshore wind farm (European testing centre)
Building on project presently under development – testing of multi-MW turbines. Development of innovative structures and substructures including optimisation of manufacturing capacities of offshore wind energy production equipment. An increase in size of 100 MW can be envisaged.
|
0,25 GW
|
United Kingdom
|
40
|
|
2.3. Thornton Bank
Building on project presently under development. Learning from the Downvind project (cofinanced through FP6). Upscaling the Downvind installations turbines (5 MW size) in deep waters (up to 30 m) with low visual impact (up to 30 km).
|
90 MW
|
Belgium
|
10
|
|
TOTAL
|
|
|
565
|
C.
Carbon capture and storage projects
|
Project Name/Location
|
Envisaged Community contribution
(EUR million)
|
Fuel
|
Capacity
|
Capture Technique
|
Storage Concept
|
|
Huerth
|
Germany
|
180
|
Coal
|
450 MW
|
IGCC
|
Saline Aquifer
|
|
Jaenschwalde
|
|
|
Coal
|
500 MW
|
Oxyfuel
|
Oil/Gas fields
|
|
Eemshaven
|
Netherlands
|
180
|
Coal
|
1 200 MW
|
IGCC
|
Oil/Gas fields
|
|
Rotterdam
|
Coal
|
1 080 MW
|
PC
|
Oil/Gas fields
|
|
Rotterdam
|
Coal
|
800 MW
|
PC
|
Oil/Gas fields
|
|
Bełchatów
|
Poland
|
180
|
Coal
|
858 MW
|
PC
|
Saline Aquifer
|
|
Compostilla
(León)
|
Spain
|
180
|
Coal
|
500 MW
|
Oxyfuel
|
Saline Aquifer
|
|
Kingsnorth
|
United Kingdom
|
180
|
Coal
|
800 MW
|
PC
|
Oil/Gas fields
|
|
Longannet
|
Coal
|
3 390 MW
|
PC
|
Saline Aquifer
|
|
Tilbury
|
Coal
|
1 600 MW
|
PC
|
Oil/Gas fields
|
|
Hatfield
(Yorkshire)
|
Coal
|
900 MW
|
IGCC
|
Oil/Gas fields
|
|
Porto Tolle
|
Italy
|
100
|
Coal
|
660 MW
|
PC
|
|
|
Industrial carbon capture project
|
|
Florange
|
France
|
50
|
Transport of CO2 from industrial installation (steel plant) to underground storage (saline aquifer)
|
|
TOTAL
|
1 050
|
|
|
ANNEX II FINANCIAL FACILITY
|
ANNEX II
FINANCIAL FACILITY
A.
Implementation of the financial facility for sustainable energy projects
1.
Scope of the facility
The financial facility (the facility) shall be used for the development of energy saving, energy efficiency and renewable energy projects and shall facilitate the financing of investments in those areas by local, regional and, in duly justified cases, national public authorities. The facility shall be implemented in accordance with the provisions on the delegation of budgetary execution tasks laid down in the Financial Regulation and its implementing rules.
The facility shall be used for sustainable energy projects, in particular in urban settings. This shall include, in particular, projects concerning:
(a)
public and private buildings incorporating energy efficiency and/or renewable energy solutions including those based on the usage of Information and Communication Technologies (ICT);
(b)
investments in high energy efficient combined heat and power (CHP), including micro-cogeneration, and district heating/cooling networks, in particular from renewable energy sources;
(c)
decentralised renewable energy sources embedded in local settings and their integration in electricity grids;
(d)
microgeneration from renewable energy sources;
(e)
clean urban transport to support increased energy efficiency and integration of renewable energy sources, with an emphasis on public transport, electric and hydrogen vehicles and reduced greenhouse gas emissions;
(f)
local infrastructure, including efficient lighting of outdoor public infrastructure such as street lighting, electricity storage solutions, smart metering, and smart grids, that make full usage of ICT;
(g)
energy efficiency and renewable energy technologies with innovation and economic potential using the best available procedures.
The facility may be also used to provide incentives and technical assistance as well as to raise the awareness of local, regional and national authorities so as to ensure optimal use of the Structural and Cohesion Funds, in particular in the areas of energy efficiency and renewable energy improvements in housing and other types of buildings. The facility shall sustain investment projects demonstrating an economic and financial viability, in order to refund the investments allocated by the facility and to attract public and private investments. Thus, the facility may, inter alia, include provisioning and capital allocation for loans, guarantees, equity and other financial products. Furthermore, up to 15 % of the funding referred to in Article 21a may be used to provide technical assistance to local, regional or national, authorities on the setting up of, and on the initial deployment phase of technology related to, energy efficiency and renewable energy projects.
2.
Synergies
When granting financial or technical assistance, attention shall also be paid to synergies with other financial resources available in the Member States, such as the Structural and Cohesion Funds and the ELENA Facility, in order to avoid overlaps with other instruments.
3.
Beneficiaries
The beneficiaries of the facility shall be public authorities, preferably at local and regional level, and public or private entities acting on behalf of those public authorities.
B.
Cooperation with financial intermediaries
1.
Selection and general requirements, including costs
The facility shall be set up in cooperation with one or more financial intermediaries, and shall be open to participation by appropriate investors. The selection of the financial intermediaries shall take place on the basis of their demonstrated ability to use the funding in the most efficient and effective way, in accordance with the rules and criteria set out in this Annex.
The Commission shall ensure that the total amount of overhead costs related to the establishment and implementation of the facility, including management fees and other eligible costs invoiced by the financial intermediaries, remains as limited as possible, in line with best practice for similar instruments and whilst safeguarding the required quality of the facility.
The Union contribution to the facility shall be implemented by the Commission in accordance with the provisions set out in Articles 53 and 54 of the Financial Regulation.
The financial intermediaries shall comply with the relevant requirements on the delegation of budgetary execution tasks set out in the Financial Regulation and its implementing rules, in particular as regards procurement rules, internal control, accounting and external audit. No funding other than management fees or costs related to the establishment and implementation of the facility shall be made available to those financial intermediaries.
The detailed terms and conditions of the establishment and the framework conditions of the facility, including monitoring and control, shall be laid down in one or more agreements between the Commission and the financial intermediaries.
2.
Availability of information
The facility shall make available online all information on programme management that is relevant for interested parties. This shall include, notably, application procedures, information on best practices and an overview of projects and reports.
C.
Funding conditions and eligibility and selection criteria
1.
Scope of financing
In accordance with this Annex, the facility shall be limited to the financing of:
(a)
investment projects that have a rapid, measurable and substantial impact on economic recovery within the Union, increased energy security and the reduction in greenhouse gas emissions; and
(b)
technical assistance for energy efficiency and renewable energy projects.
2.
Factors to be taken into account
As regards the selection of projects, particular attention shall be paid to the geographical balance.
As regards the financing of investment projects, due attention shall be paid to reaching a significant leverage factor between the total investment and the Union funding in order to raise significant investments in the Union. However, the leverage factor for individual investment projects may vary, depending on a number of factors such as the actual size and type of a project and on local conditions including the size and financial capabilities of the beneficiary.
3.
Conditions for public authorities’ access to financing under the facility
Public authorities requesting financing for investment projects or technical assistance for energy efficiency and renewable energy projects shall comply with the following conditions:
(a)
they have made, or are in the process of making, a political commitment to mitigate climate change, where appropriate including concrete objectives, for example relating to increasing energy efficiency and/or the use of energy from renewable sources;
(b)
they are either working towards developing multi-annual strategies to mitigate climate change and, where appropriate, to attain their objectives, or are participating in a multi-annual strategy at local, regional or national level to mitigate climate change;
(c)
they agree to be publicly accountable for the progress in their overall strategy.
4.
Eligibility and selection criteria for investment projects financed under the facility
Investment projects financed under the facility shall comply with the following eligibility and selection criteria:
(a)
the soundness and technical adequacy of the approach;
(b)
the soundness and cost effectiveness of the funding for the full investment phase of the action;
(c)
the geographical balance of all projects covered by this Regulation;
(d)
maturity, defined as reaching the investment stage, and incurring substantial capital expenditure as soon as possible;
(e)
the extent to which lack of access to finance is delaying the implementation of the action;
(f)
the extent to which funding from the facility will stimulate public and private finance;
(g)
quantified socioeconomic impacts;
(h)
quantified environmental impacts.
5.
Eligibility and selection criteria for technical assistance projects financed under the facility
Technical assistance projects financed under the facility shall comply with the eligibility and selection criteria referred to in point 4(a), (c), (e), (f) and (g).
|
|
►M1 PRIEDAS ◄ FINANSAVIMO REIKALAVIMUS ATITINKANTYS PROJEKTAI A. Dujos ir …
|
►M1
PRIEDAS
◄
FINANSAVIMO REIKALAVIMUS ATITINKANTYS PROJEKTAI
A.
Dujos ir elektros energijos infrastruktūros projektai
1. Dujų jungiamosios linijos
|
Projektas
|
Remiamų projektų vieta
|
Numatomas Bendrijos įnašas
(mln. EUR)
|
|
Pietinis dujų koridorius
|
|
NABUCCO
|
Austrija, Vengrija, Bulgarija, Vokietija, Rumunija
|
200
|
|
ITGI – Poseidon
|
Italija, Graikija
|
100
|
|
Baltijos jungiamoji linija
|
|
Skanled (Baltijos dujotekis)
|
Lenkija, Danija, Švedija
|
150
|
|
Suskystintų gamtinių dujų tinklas
|
|
Suskystintų gamtinių dujų terminalas Lenkijos pakrantėje, Svinouiscio uoste
|
Lenkija
|
80
|
|
Vidurio ir pietryčių Europa
|
|
Slovakijos ir Vengrijos jungiamoji linija (Veľký Krtyšas – Vecsés)
|
Slovakija, Vengrija
|
30
|
|
Dujų perdavimo sistema Slovėnijoje nuo Austrijos sienos iki Liublianos (išskyrus Rogateco–Kidričevo ruožą)
|
Slovėnija
|
40
|
|
Bulgarijos ir Graikijos jungiamoji linija (Stara Zagora – Dimitrovgrad-Komotini)
|
Bulgarija, Graikija
|
45
|
|
Rumunijos ir Vengrijos dujų jungiamoji linija
|
Rumunija, Vengrija
|
30
|
|
Dujų saugojimo pajėgumų padidinimas Čekijos centre
|
Čekija
|
35
|
|
Infrastruktūra ir įranga, užtikrinančios dujų srautą priešinga kryptimi trumpalaikių tiekimo sutrikimų atveju
|
Austrija, Bulgarija, Čekija, Estija, Graikija, Vengrija, Latvija, Lietuva, Lenkija, Portugalija, Rumunija, Slovakija
|
80
|
|
Slovakijos ir Lenkijos jungiamoji linija
|
Slovakija, Lenkija
|
20
|
|
Vengrijos ir Kroatijos jungiamoji linija
|
Vengrija
|
20
|
|
Bulgarijos ir Rumunijos jungiamoji linija
|
Bulgarija, Rumunija
|
10
|
|
Viduržemio jūros regionas
|
|
Prancūzijos dujų tinklo sustiprinimas ašyje Afrika–Ispanija–Prancūzija
|
Prancūzija
|
200
|
|
GALSI (Alžyro ir Italijos dujotiekis)
|
Italija
|
120
|
|
Dujų jungiamoji linija, Vakarinė ašis, Larrau atšaka
|
Ispanija
|
45
|
|
Šiaurės jūros regionas
|
|
Vokietijos, Belgijos ir Jungtinės Karalystės dujotiekis
|
Belgija
|
35
|
|
Prancūzijos ir Belgijos jungtis
|
Prancūzija, Belgija
|
200
|
|
IŠ VISO
|
|
1 440
|
2. Elektros jungiamosios linijos
|
Projektas
|
Remiamų projektų vieta
|
Numatomas Bendrijos įnašas
(mln. EUR)
|
|
Baltijos jungiamoji linija
|
|
Estlink-2
|
Estija, Suomija
|
100
|
|
Švedijos ir Baltijos valstybių jungiamoji linija ir Baltijos valstybių elektros tinklo sustiprinimas
|
Švedija, Latvija, Lietuva
|
175
|
|
Vidurio ir pietryčių Europa
|
|
Halė (Zalė) – Šveinfurtas
|
Vokietija
|
100
|
|
Viena-Győr
|
Austrija, Vengrija
|
20
|
|
Viduržemio jūros regionas
|
|
Portugalijos ir Ispanijos jungiamosios linijos stiprinimas
|
Portugalija
|
50
|
|
Prancūzijos ir Ispanijos jungiamoji linija (Baiša – Sta Llogaia)
|
Prancūzija, Ispanija
|
225
|
|
Naujas 380 kV AC povandeninis kabelis tarp Sicilijos ir žemyninės Italijos (Sorgente–Ridzikonis)
|
Italija
|
110
|
|
Šiaurės jūros regionas
|
|
500 MW Airijos ir Velso jungiamoji linija (Meath-Deeside)
|
Airija, Jungtinė Karalystė
|
110
|
|
Maltos ir Italijos elektros jungiamoji linija
|
Malta, Italija
|
20
|
|
IŠ VISO
|
|
910
|
3. Mažų salų projektai
|
Mažų izoliuotų salų iniciatyvos
|
Kipras
|
10
|
|
Malta
|
5
|
|
IŠ VISO
|
|
15
|
B.
Jūros vėjo energijos projektai
|
Projektas
|
Pajėgumas
|
Remiamų projektų vieta
|
Numatomas Bendrijos įnašas
(mln. EUR)
|
|
1. Jūros vėjo energijos integravimas į energetikos tinklą
|
|
1.1. Baltic – Kriegers Flak I, II, III
Remiantis vykdomais projektais. Finansavimas skiriamas papildomoms bendros jungiamosios linijos užtikrinimo išlaidoms padengti.
|
1,5 GW
|
Danija, Švedija, Vokietija, Lenkija
|
150
|
|
1.2. Šiaurės jūros energetikos tinklas
Jūros vėjo energijos tiekimo tinklo modulinė plėtra, virtualios jūros vėjo jėgainės demonstracija ir integravimas į krante esančią tinklų sistemą.
|
1 GW
|
Jungtinė Karalystė, Nyderlandai, Vokietija, Airija, Danija, Belgija, Prancūzija, Liuksemburgas
|
165
|
|
2. Naujos turbinos, statiniai ir komponentai, gamybos pajėgumų optimizavimas
|
|
2.1. Borkum West II – Bard 1 Nordsee Ost – Global Tech I
Naujos kartos didelio galingumo (5–7 MW) turbinos ir naujoviški statiniai, pastatyti toli nuo kranto (iki 100 km atstumu) gilesniuose vandenyse (iki 40 m).
|
1,6 GW
|
Vokietija
|
200
|
|
2.2. Aberdyno jūros vėjo jėgainės (Europos bandymų centras)
Remiantis šiuo metu vykdomu projektu – didelio našumo turbinų bandymai. Naujoviškų statinių ir postruktūrių vystymas, įskaitant jūros vėjo energiją generuojančios įrangos gamybos pajėgumų optimizavimą. Galima numatyti 100 MW padidėjimą.
|
0,25 GW
|
Jungtinė Karalystė
|
40
|
|
2.3. Thornton Bank
Remiantis šiuo metu vykdomu projektu. Remiamasi Downvind projekto (bendrai finansuojamo per BP6) įgyvendinimo patirtimi. Downvind įrengimų turbinų (5 MW dydžio) padidinimas giliuosiuose vandenyse (iki 30 m) esant mažam regimajam poveikiui (iki 30 km).
|
90 MW
|
Belgija
|
10
|
|
IŠ VISO
|
|
|
565
|
C.
Anglies dioksido surinkimo ir saugojimo projektai
|
Projekto pavadinimas Vieta
|
Numatomas Bendrijos įnašas
(mln. EUR)
|
Kuras
|
Pajėgumas
|
Surinkimo metodas
|
Saugojimo koncepcija
|
|
Huerth
|
Vokietija
|
180
|
Anglis
|
450 MW
|
IGCC
|
Sūraus vandens rezervuaras
|
|
Jaenschwalde
|
|
|
Anglis
|
500 MW
|
Oxyfuel
|
Naftos (dujų) telkiniai
|
|
Eemshaven
|
Nyderlandai
|
180
|
Anglis
|
1 200 MW
|
IGCC
|
Naftos (dujų) telkiniai
|
|
Roterdamas
|
Anglis
|
1 080 MW
|
PC
|
Naftos (dujų) telkiniai
|
|
Roterdamas
|
Anglis
|
800 MW
|
PC
|
Naftos (dujų) telkiniai
|
|
Bełchatów
|
Lenkija
|
180
|
Anglis
|
858 MW
|
PC
|
Sūraus vandens rezervuaras
|
|
Compostilla
(León)
|
Ispanija
|
180
|
Anglis
|
500 MW
|
Oxyfuel
|
Sūraus vandens rezervuaras
|
|
Kingsnorth
|
Jungtinė Karalystė
|
180
|
Anglis
|
800 MW
|
PC
|
Naftos (dujų) telkiniai
|
|
Longannet
|
Anglis
|
3 390 MW
|
PC
|
Sūraus vandens rezervuaras
|
|
Tilbury
|
Anglis
|
1 600 MW
|
PC
|
Naftos (dujų) telkiniai
|
|
Hatfield
(Jorkšyras)
|
Anglis
|
900 MW
|
IGCC
|
Naftos (dujų) telkiniai
|
|
Porto Tolle
|
Italija
|
100
|
Anglis
|
660 MW
|
PC
|
|
|
Pramoninio anglies dioksido surinkimo projektas
|
|
Florange
|
Prancūzija
|
50
|
Anglies dioksido transportavimas iš pramoninių įrenginių (plieno gamyklos) į požeminę saugyklą (sūraus vandens rezervuarą)
|
|
IŠ VISO
|
1 050
|
▼M1
|
,
1.1 Nuorodos
1.2 Nustatyti reikalavimai
1.3 Susiję standartai
2. Nustatyti reikalavimai
Reikalavimai
| Šaltinis |
Reikalavimas |
3. Susiję standartai
Standartai
| Šaltinis |
Reikalavimas |
|