+Analytic 1874

Analytic 1874

Real-time monitoring identifies an Industrial Control System (ICS) protocol write to a controller's task/organization-block configuration from a source not in the approved engineering workstation list, correlated against post-modification cycle timing deviation. Documented precedent: Stuxnet infected Siemens OB1 (main execution cycle block) so its malicious payload ran every cycle, and infected OB35 (watchdog/interrupt block) to suppress error reporting. OT operational-fidelity gate: Alert only when the action is not attributable to an authorized operator/engineering source for the specific target and function, and it is either outside an approved change/maintenance window or lacks matching change-control context; where telemetry permits, require corroborating device, configuration, or process-state effect. Suppress activity that fully matches approved maintenance, commissioning, failover, recovery, or tested control procedures.

1. Преглед

Наименование Стандарт

1.1 Препратки

1.2 Идентифицирани изисквания

1.3 Свързани регулации

2. Идентифицирани изисквания

Изисквания
Източник Изискване

3. Свързани регулации

Регулации
Източник Регулация

Свързани задачи

Връзки
Тип връзка Задача
is related to Analytics
  • MITREATTACK -

    © 2026 The MITRE Corporation. This work is reproduced and distributed with the permission of The MITRE Corporation. https://attack.mitre.org/

    Terms of Use

    LICENSE

    The MITRE Corporation (MITRE) hereby grants you a non-exclusive, royalty-free license to use ATT&CK® for research, development, and commercial purposes. Any copy you make for such purposes is authorized provided that you reproduce MITRE's copyright designation and this license in any such copy.

    "© 2026 The MITRE Corporation. This work is reproduced and distributed with the permission of The MITRE Corporation."

    DISCLAIMERS

    MITRE does not claim ATT&CK enumerates all possibilities for the types of actions and behaviors documented as part of its adversary model and framework of techniques. Using the information contained within ATT&CK to address or cover full categories of techniques will not guarantee full defensive coverage as there may be undisclosed techniques or variations on existing techniques not documented by ATT&CK.

    ALL DOCUMENTS AND THE INFORMATION CONTAINED THEREIN ARE PROVIDED ON AN "AS IS" BASIS AND THE CONTRIBUTOR, THE ORGANIZATION HE/SHE REPRESENTS OR IS SPONSORED BY (IF ANY), THE MITRE CORPORATION, ITS BOARD OF TRUSTEES, OFFICERS, AGENTS, AND EMPLOYEES, DISCLAIM ALL WARRANTIES, EXPRESS OR IMPLIED, INCLUDING BUT NOT LIMITED TO ANY WARRANTY THAT THE USE OF THE INFORMATION THEREIN WILL NOT INFRINGE ANY RIGHTS OR ANY IMPLIED WARRANTIES OF MERCHANTABILITY OR FITNESS FOR A PARTICULAR PURPOSE.

    See our FAQ for more information on how to use and represent the ATT&CK name.