+Article 12 4.

Article 12 4.

The operator shall be responsible for the maintenance, monitoring, control and corrective measures in the after-closure phase for as long as may be required by the competent authority, taking into account the nature and duration of the hazard, save where the competent authority decides to take over such tasks from the operator, after a waste facility has been finally closed and without prejudice to any national or Community legislation governing the liability of the waste holder.

1. Přehled

,
Název Regulace

1.1 Odkazy

1.2 Identifikované požadavky

1.3 Související standardy

2. Identifikované požadavky

Požadavky
Zdroj Požadavek

3. Související standardy

Standardy
Zdroj Požadavek
  • Builddate: 07.08.2009 00:00:00 -Doknr: CELEX:32006L0021
  • EULAW -

    EN: Legal acts of the European Union from EUR-Lex, https://eur-lex.europa.eu/. © European Union. Re-use is authorised by Decision 2011/833/EU, provided the source is acknowledged; the consolidated texts are licensed under CC BY 4.0 (EUR-Lex legal notice). Divided into sections and converted into the GRCA format, the wording unchanged. Only the legislation published in the Official Journal of the European Union is deemed authentic.

    DE: Rechtsakte der Europäischen Union aus EUR-Lex, https://eur-lex.europa.eu/. © Europäische Union. Weiterverwendung nach Beschluss 2011/833/EU mit Quellenangabe gestattet; die konsolidierten Fassungen stehen unter CC BY 4.0 (Rechtlicher Hinweis von EUR-Lex). In Abschnitte aufgeteilt und in das GRCA-Format umgewandelt, der Wortlaut unverändert. Verbindlich sind allein die im Amtsblatt der Europäischen Union veröffentlichten Rechtsakte.