GRCA Planeth
Nejste přihlášeni
Přihlásit se
Start
Zdroje
›
MP-08 Media Downgrading
›
Standard - MP-08(02) Equipment Testing
+MP-08(02) Equipment Testing
MP-08(02) Equipment Testing
Control
Test downgrading equipment and procedures [Assignement: organization-defined frequency] to ensure that downgrading actions are being achieved.
Discussion
None.
Assessment Objective
downgrading equipment is tested [Assignement: frequency] to ensure that downgrading actions are being achieved;
downgrading procedures are tested [Assignement: frequency] to ensure that downgrading actions are being achieved.
Assessment Method
Examine
System media protection policy procedures addressing media downgrading procedures addressing testing of media downgrading equipment results of downgrading equipment and procedures testing records of media downgrading audit records system security plan other relevant documents or records
Interview
Organizational personnel with system media downgrading responsibilities organizational personnel with information security responsibilities
1. Přehled
Název
Standard
1.1 Odkazy
1.2 Identifikované požadavky
1.3 Související regulace
2. Identifikované požadavky
Požadavky
Zdroj
Požadavek
3. Související regulace
Regulace
Zdroj
Regulace
Propojené úkoly
Vazby
Typ vazby
Úkol
is blocked by
MP-08(02) Equipment Testing – Assessment Procedure
NIST
-
https://csrc.nist.gov/pubs/sp/800/53/r5/upd1/final