+INF.12 Cabling
---+INF.12.G1. Cable Fires
---+INF.12.G2. Inadequate Dimensioning of Cabling
---+INF.12.G3. Insufficient Documentation on Cabling
---+INF.12.G4. Inadequately Protected Distributors
---+INF.12.G5. Cable Damage
---+INF.12.G6. Voltage Fluctuations, Overvoltage, and Undervoltage
---+INF.12.G7. Use of Low-Quality Power Strips
---+INF.12.G8. Unauthorised Cable Connections
---+INF.12.G9. Impairment of Lines
---+INF.12.G10. Eavesdropping and Manipulation of Cables
---+INF.12.A1 Selection of Appropriate Cable Types [IT Operation Department, Building Services] (B)
---+INF.12.A2 Planning Cable Routing [IT Operation Department, Building Services] (B)
---+INF.12.A3 Proper Installation [IT Operation Department, Building Services] (B)
---+INF.12.A4 EMC-Compliant Power Supply [Building Services] (B)
---+INF.12.A5 Requirements Analysis for Cabling [IT Operation Department, Building Services] (S)
---+INF.12.A6 Cabling Approval [IT Operation Department, Building Services] (S)
---+INF.12.A7 Overvoltage Protection [Building Services] (S)
---+INF.12.A8 Removing and Disabling Cables No Longer Required [IT Operation Department, Building Services] (S)
---+INF.12.A9 Fire Prevention in Trays [Building Services] (S)
---+INF.12.A10 Documentation and Labelling of Cabling [IT Operation Department, Building Services] (S)
---+INF.12.A11 Neutral Documentation in Distributors [IT Operation Department, Building Services] (S)
---+INF.12.A12 Inspection of Electrical Installations and Existing Connections [IT Operation Department, Building Services] (S)
---+INF.12.A13 Avoidance of Electrical Ignition Sources [Building Services] (S)
---+INF.12.A14 A-B Supply [Building Services] (B)
---+INF.12.A15 Material Protection of Cabling [IT Operation Department, Building Services] (H)
---+INF.12.A16 Use of Cabinet Systems [Building Services] (H)
---+INF.12.A17 Redundancies for IT Cabling [IT Operation Department] (H)

INF.12 Cabling

Introduction

The proper and standards-compliant installation of cabling is part of the basis for secure IT operations. A fundamental distinction must be made between electrical cabling and IT cabling in this regard.

The electrical cabling of IT systems and other devices includes all cables and distributors in a given building, from the feed-in point of the distribution network operator to the connections of end devices.

The IT cabling in an organisation includes all communication cables and passive components such as patch panels or marshalling panels/splice distributors. It therefore forms the physical basis of the internal communication networks. IT cabling ranges from the transfer points from an external network to the connection points of the network users at hand. Transfer points include the connection of a telecommunications provider or the DSL connection of an Internet provider, for example.

Despite this distinction, the fundamental requirements for both types of cabling are identical. The cabling within an organisation should thus always also be considered as a whole.

Objective

The aim of this module is to protect all electrical cabling and IT cabling from failure, manipulation, and malfunction.

Scoping and Modelling

Module INF.12 Cabling must be applied once to the cabling in buildings and rooms as a supplement to module INF.1 Generic Building. The requirements of the present module should always be applied to both IT and electrical cabling.

Useful Resources

The German Institute for Standardisation (DIN) publishes specifications that apply to cabling. The following standards are relevant in this regard:

  • DIN 4102, "Fire Behaviour of Building Materials and Elements"
  • DIN IEC 60364, "Erection of Low-Voltage Installations"
  • IEC 62305, Lightning Protection Standard DIN EN 62305 / VE 01805-305:2006
  • IN VDE 0100, "Erection of Low-Voltage Installations"
  • DIN VDE 0105-100, "Operation of Electrical Installations"
  • DIN 41494-8, "Mechanical Structures for Electronic Equipment"
  • DIN EN 50173, "Information Technology – Generic Cabling Systems"
  • DIN EN 50174, "Information Technology – Cabling Installation"
  • DIN EN 50310:2017-02, "Telecommunications Bonding Networks for Buildings and Other Structures"
  • DIN EN 50346:2010-02, "Information Technology – Cabling Installation – Testing of Installed Cabling"
  • DIN IEC 60297, "Mechanical Structures for Electrical and Electronic Equipment"

The German Social Accident Insurance Institution for the health and welfare services (BGW) has published further regulations for electrical cabling in DGUV Regulation 3, “Electrical Installations and Equipment, Accident Prevention Regulation”.

The International Organization for Standardization (ISO) provides guidelines for IT cabling in the standard ISO/IEC 11801:2002-09, “Information Technology – Generic Cabling for Customer Premises”.

1. Přehled

Název Standard
INF.12.A1 Selection of Appropriate Cable Types [IT Operation Department, Building Services] (B)

When selecting cable types, the necessary transmission features MUST be checked. The relevant standards and regulations MUST be observed. The environmental conditions present during operation and installation MUST also be taken into account. With regard to environmental conditions, the following factors MUST be considered:

  • temperatures
  • cable paths
  • tensile forces during installation
  • type of installation
  • distance between end points and possible sources of interference
INF.12.A2 Planning Cable Routing [IT Operation Department, Building Services] (B)

Cables, cable routes, and cable trays MUST be dimensioned adequately from both a functional and a physical perspective. In this respect, future requirements MUST also be taken into account, such as sufficient space for possible technical expansions in cable channels and trays. When routing IT and power cabling together in a tray, crosstalk MUST also be prevented among the individual cables. Care MUST be taken to ensure that IT cabling and electrical cabling are routed with the amount of separation specified in the relevant standards. Cables MUST be routed to avoid identifiable sources of risk.

INF.12.A3 Proper Installation [IT Operation Department, Building Services] (B)

Installation work on cabling MUST be carried out competently and carefully. All the relevant standards MUST be observed during installation. A person with corresponding expertise MUST check that cabling is installed properly at all stages. Whether the right cables and connection components have been delivered MUST be checked at the time of delivery. Care MUST be taken to ensure that the installation does not cause any damage. In addition, the cable routes MUST be chosen in a way that prevents the installed cables from being damaged by normal use of the surrounding building.

INF.12.A4 EMC-Compliant Power Supply [Building Services] (B)

The power supply at hand MUST be EMC (electromagnetic compatibility) compliant. To this end, the corresponding power distribution network MUST be designed as a TN-S system. When setting up and operating the power distribution network, the separation distances recommended in the relevant standards MUST be observed to the greatest extent possible. Precautions MUST be taken against external irradiation, power line emissions, and detection of transient currents.

INF.12.A5 Requirements Analysis for Cabling [IT Operation Department, Building Services] (S)

As a general rule, the requirements that may affect the economic efficiency of a cabling installation and its ability to meet all current and future requirements SHOULD be analysed. This requirements analysis SHOULD initially project how the cabling will be used within the organisation in question in the short term. On this basis, estimates SHOULD be made as to how usage might evolve over the longer term. Furthermore, the security objectives of availability, integrity, and confidentiality MUST also be taken into consideration during requirements analysis for cabling.

INF.12.A6 Cabling Approval [IT Operation Department, Building Services] (S)

There SHOULD be an approval process for cabling. Cabling SHOULD always be approved only after all the tasks at hand (possibly within the framework of a milestone) have been completed. The party responsible for its installation SHOULD have reported the tasks as completed and ready for approval. In addition, inspections by the client SHOULD not have revealed any unacceptable defects. The approval date SHOULD be selected so that there is enough time in advance to prepare for the approval inspections. The contractor involved MUST provide written evidence of compliance with all the applicable standards and regulations no later than the approval date. The actual scope of the services rendered MUST be verified during the approval process. A checklist SHOULD be drawn up for the approval report. The approval report MUST be signed in a legally binding manner by the participants and all the persons in charge. The report MUST be part of the internal documentation of cabling.

INF.12.A7 Overvoltage Protection [Building Services] (S)

Every electrical network SHOULD be protected against overvoltage. For this purpose, a corresponding overvoltage protection concept MUST be created that complies with the applicable standards. Emergency power systems (EPS) and uninterruptible power supplies (UPS) MUST be included in the overvoltage protection concept.

INF.12.A8 Removing and Disabling Cables No Longer Required [IT Operation Department, Building Services] (S)

If power cables are no longer required, they SHOULD be properly and completely removed. After cables have been removed, firestop seals MUST be professionally sealed.

Cables that are currently no longer needed but can be reasonably left in place as a reserve with the existing technology SHOULD be maintained in a serviceable condition. At minimum, such cables MUST be labelled accordingly at their end points.

In principle, an overview of cables that are no longer needed SHOULD be created. The documentation SHOULD show which cables have been removed or disabled.

INF.12.A9 Fire Prevention in Trays [Building Services] (S)

Trays SHOULD be adequately dimensioned. Trays SHOULD have adequate ventilation.

INF.12.A10 Documentation and Labelling of Cabling [IT Operation Department, Building Services] (S)

An organisation SHOULD ensure that it has internal and external documentation for its cabling. The internal documentation MUST include all records on the installation and operation of the cabling. The internal documentation SHOULD be comprehensively produced and maintained in such a way that operations and further development are supported as effectively as possible. The external documentation (labelling of connections to support operations) of the cabling SHOULD be kept as neutral as possible.

Every change in the network SHOULD be documented. An interim or working version of the documentation SHOULD be adapted immediately (i.e. on the same day as a given change). The master documentation MUST be updated no later than four weeks after completion of the respective work. Whether a document management system can be used for the documentation SHOULD be checked. The documentation SHOULD be reviewed and updated regularly. All technical equipment documented within the scope of cabling MUST be checked with regard to documentation compliance after four years at the latest.

INF.12.A11 Neutral Documentation in Distributors [IT Operation Department, Building Services] (S)

There SHOULD be documentation in every distributor that reflects the current marshalling and line assignments. The documentation in the distributor MUST enable safe switching.

The documentation in the distributor SHOULD be kept as neutral as possible. The documentation in the distributor SHOULD only list existing and used connections and accumulating reserve cables. If possible, no references to the way cables are used SHOULD be given. References SHOULD be limited to those that are expressly prescribed. All further information SHOULD be provided in review documentation.

INF.12.A12 Inspection of Electrical Installations and Existing Connections [IT Operation Department, Building Services] (S)

All electrical installations and equipment SHOULD be inspected regularly according to DGUV Vorschrift 3 [DGUV Regulation 3] in line with the implementation instructions mentioned in section 5, "Tests". Any irregularities detected MUST be documented immediately. Any irregularities detected MUST also be reported immediately to the responsible organisational units. The responsible organisational units MUST remedy the detected irregularities promptly enough to ensure there is no threat to people. The availability of the electrical installations and equipment MUST be ensured to the extent they are required.

INF.12.A13 Avoidance of Electrical Ignition Sources [Building Services] (S)

The use of electrical appliances and equipment intended for private use SHOULD be clearly regulated within an organisation. All electrical equipment MUST be tested and deemed safe by a qualified electrician before it is used. The use of power strips SHOULD be avoided whenever possible. If additional sockets are required, they SHOULD be professionally retrofitted by a qualified electrician.

INF.12.A14 A-B Supply [Building Services] (B)

Instead of a single-line power supply, a two-line A-B supply SHOULD be considered to supply important IT components and other consumers. The functionality of the power supply SHOULD be continuously monitored by suitable technical equipment.

INF.12.A15 Material Protection of Cabling [IT Operation Department, Building Services] (H)

Consideration SHOULD be given to securing cables and distributors against unauthorised access in all rooms of a building, especially in rooms frequented by the public and in areas that are difficult to see. In any case, the number and extent of places where power supply equipment and data network access points are accessible to unauthorised persons SHOULD be minimised.

INF.12.A16 Use of Cabinet Systems [Building Services] (H)

Electrical connections and distributors SHOULD be placed or built into cabinet systems. The dimensioning of the cabinet systems SHOULD take into account the growth expected for the planned period of use.

INF.12.A17 Redundancies for IT Cabling [IT Operation Department] (H)

Consideration SHOULD be given to creating redundant primary IT cabling that is routed through independent trays. Whether or not redundant connections to IT or telecommunication providers should be installed SHOULD also be examined. In case of high or very high availability requirements, consideration SHOULD be given to installing redundant secondary and tertiary cabling in the relevant buildings. Redundantly designed parts of the secondary cabling SHOULD be routed through different fire zones. If redundant cabling is used, its proper functioning SHOULD be checked at regular intervals.

1.1 Odkazy

1.2 Identifikované požadavky

1.3 Související regulace

2. Identifikované požadavky

Požadavky
Zdroj Požadavek

3. Související regulace

Regulace
Zdroj Regulace

Propojené úkoly