+OPS.1.2.5.A21 Creation of a Business Continuity Plan in Case of Remote Maintenance Failure (S)

OPS.1.2.5.A21 Creation of a Business Continuity Plan in Case of Remote Maintenance Failure (S)

A plan SHOULD be developed to minimise the consequences of a failure of remote maintenance components. This SHOULD specify how to react in case of a failure. The contingency plan SHOULD ensure that disruptions and damage (both immediate and consequential) are minimised. It SHOULD also specify how normal operations can be resumed in a timely manner.

1. Přehled

Název Standard

1.1 Odkazy

1.2 Identifikované požadavky

1.3 Související regulace

2. Identifikované požadavky

Požadavky
Zdroj Požadavek

3. Související regulace

Regulace
Zdroj Regulace

Propojené úkoly