|
+APP.4.4.A17 Attestation of Nodes (H) |
APP.4.4.A17 Attestation of Nodes (H)Nodes SHOULD send a cryptographically secured (and, if possible, TPM-verified) status message to the control plane. The control plane SHOULD ONLY accept nodes into a cluster that have successfully proven their integrity. 1. Přehled
1.1 Odkazy1.2 Identifikované požadavky1.3 Související regulace2. Identifikované požadavky
3. Související regulace
Propojené úkoly
|