|
+Article 14 1. |
Article 14 1.The competent authority shall, prior to the commencement of any operations involving the accumulation or deposit of extractive waste in a waste facility, require a financial guarantee (e.g. in the form of a financial deposit, including industry-sponsored mutual guarantee funds) or equivalent, in accordance with procedures to be decided by the Member States, so that:
(a)
all obligations under the permit issued pursuant to this Directive, including after-closure provisions, are discharged;
(b)
there are funds readily available at any given time for the rehabilitation of the land affected by the waste facility, as described in the waste management plan prepared pursuant to Article 5 and required by the Article 7 permit. 1. Přehled
1.1 Odkazy1.2 Identifikované požadavky1.3 Související standardy2. Identifikované požadavky
3. Související standardy
|