+5. Network users shall be advised about the type of circumstance that could affect the availability …
|
5. Network users shall be advised about the type of circumstance that could affect the availability …
|
5.
|
Network users shall be advised about the type of circumstance that could affect the availability of contracted capacity. Information on interruption shall reflect the level of information available to the transmission system operator.
|
1. Přehled
1.1 Odkazy
1.2 Identifikované požadavky
1.3 Související standardy
2. Identifikované požadavky
Požadavky
| Zdroj |
Požadavek |
3. Související standardy
Standardy
| Zdroj |
Požadavek |
|