+4. For the purpose of determining transmission system operators’ revenue, technical capacity, in …
|
4. For the purpose of determining transmission system operators’ revenue, technical capacity, in …
|
4.
|
For the purpose of determining transmission system operators’ revenue, technical capacity, in particular surrendered capacity as well as, where relevant, capacity arising from the application of firm day-ahead use-it-or-lose-it and long-term use-it-or-lose-it mechanisms, shall be considered to be allocated prior to any additional capacity.
|
1. Přehled
1.1 Odkazy
1.2 Identifikované požadavky
1.3 Související standardy
2. Identifikované požadavky
Požadavky
| Zdroj |
Požadavek |
3. Související standardy
Standardy
| Zdroj |
Požadavek |
|