Assessment Objective
Determine if:
- PE-11(01)[01] an alternate power supply provided for the system is activated [Selection: manually; automatically];
- PE-11(01)[02] the alternate power supply provided for the system can maintain minimally required operational capability in the event of an extended loss of the primary power source.
Assessment Methods
Examine
- Physical and environmental protection policy
- procedures addressing emergency power
- alternate power supply
- alternate power supply documentation
- alternate power supply test records
- system security plan
- other relevant documents or records
Interview
- Organizational personnel with the responsibility for emergency power and/or planning
- organizational personnel with information security responsibilities
Test
- Mechanisms supporting and/or implementing an alternate power supply
- the alternate power supply
Linkede sager
| Linktype | Sag |
|---|---|
| blocks | PE-11(01) Alternate Power Supply — Minimal Operational Capability |