+IND.1.A5 Development of a Suitable Zone Concept [Planner] (S)
|
IND.1.A5 Development of a Suitable Zone Concept [Planner] (S)
OT infrastructure SHOULD also be segmented horizontally into independent functional areas such as facilities. The individual zones SHOULD be as independent of one another as possible during operations. In particular, the zones where the respective technical process is controlled SHOULD continue to function for a certain period of time if the other zones fail. Decoupling SHOULD also continue to function after an attack. This period SHOULD be suitably defined and documented. The network SHOULD be designed to be resistant to errors and manipulation.
1. Oversigt
1.1 Referencer
1.2 Identificerede krav
1.3 Relaterede reguleringer
2. Identificerede krav
3. Relaterede reguleringer
Reguleringer
| Kilde |
Regulering |
Linkede sager
|