+DIRECTIVE 2009/126/EC OF THE EUROPEAN PARLIAMENT AND OF THE COUNCIL of 21 October 2009 on Stage II petrol vapour recovery during refuelling of motor vehicles at service stations
---+Article 1 Subject matter
---+Article 2 Definitions
---+Article 3 Service stations
------+Article 3 1.
------+Article 3 2.
------+Article 3 3.
------+Article 3 4.
---+Article 4 Minimum level of petrol vapour recovery
------+Article 4 1.
------+Article 4 2.
---+Article 5 Periodic checks and consumer information
------+Article 5 1.
------+Article 5 2.
------+Article 5 3.
---+Article 6 Penalties
---+Article 7 Review
---+Article 8 Technical adaptations
---+Article 8a Exercise of the delegation
------+Article 8a 1.
------+Article 8a 2.
------+Article 8a 3.
------+Article 8a 4.
------+Article 8a 5.
------+Article 8a 6.
---+Article 10 Transposition
------+Article 10 1.
------+Article 10 2.
---+Article 11 Entry into force
---+Article 12 Addressees
English - European Union - Energy - Environment -

DIRECTIVE 2009/126/EC OF THE EUROPEAN PARLIAMENT AND OF THE COUNCIL of 21 October 2009 on Stage II petrol vapour recovery during refuelling of motor vehicles at service stations

DIRECTIVE 2009/126/EC OF THE EUROPEAN PARLIAMENT AND OF THE COUNCIL

of 21 October 2009

on Stage II petrol vapour recovery during refuelling of motor vehicles at service stations

1. Oversigt

,
Titel Regulering
Article 1 Subject matter

Article 1

Subject matter

This Directive lays down measures aimed at reducing the amount of petrol vapour emitted to the atmosphere during the refuelling of motor vehicles at service stations.

Article 2 Definitions

Article 2

Definitions

For the purposes of this Directive:

1. 

‘petrol’ means petrol as defined in Article 2(a) of Directive 94/63/EC;

2. 

‘petrol vapour’ means any gaseous compound which evaporates from petrol;

3. 

‘service station’ means a service station as defined in Article 2(f) of Directive 94/63/EC;

4. 

‘existing service station’ means a service station which is built or for which an individual planning permission, construction licence or operating licence is granted before 1 January 2012;

5. 

‘new service station’ means a service station which is built or for which an individual planning permission, construction licence or operating licence is granted on or after 1 January 2012;

6. 

‘Stage II petrol vapour recovery system’ means equipment aimed at recovering the petrol vapour displaced from the fuel tank of a motor vehicle during refuelling at a service station and which transfers that petrol vapour to a storage tank at the service station or back to the petrol dispenser for resale;

7. 

‘petrol vapour capture efficiency’ means the amount of petrol vapour captured by the Stage II petrol vapour recovery system compared to the amount of petrol vapour that would otherwise be emitted to the atmosphere in the absence of such a system and expressed as a percentage;

8. 

‘vapour/petrol ratio’ means the ratio between the volume at atmospheric pressure of petrol vapour passing through the Stage II petrol vapour recovery system and the volume of petrol dispensed;

9. 

‘throughput’ means the total annual quantity of petrol unloaded from mobile containers into a service station.

Article 3 Service stations
Article 4 Minimum level of petrol vapour recovery
Article 5 Periodic checks and consumer information
Article 6 Penalties

Article 6

Penalties

Member States shall lay down the rules on penalties applicable to infringements of the national provisions adopted pursuant to this Directive and shall take all measures necessary to ensure that they are implemented. The penalties provided for must be effective, proportionate and dissuasive. Member States shall notify those provisions to the Commission by 1 January 2012 and shall notify it without delay of any subsequent amendment affecting them.

Article 7 Review

Article 7

Review

The Commission shall, by 31 December 2014, review the implementation of this Directive and, in particular:

(a) 

the 100 m3/year threshold referred to in Article 3(1)(b) and (2)(b) of this Directive and Article 6(3) of Directive 94/63/EC;

(b) 

the in-service compliance record of Stage II petrol vapour recovery systems; and

(c) 

the need for automatic monitoring equipment.

It shall report the results of that review to the European Parliament and to the Council accompanied, if appropriate, by a legislative proposal.

Article 8 Technical adaptations

Article 8

Technical adaptations

The Commission is empowered to adopt delegated acts in accordance with Article 8a amending Articles 4 and 5 to adapt them to technical progress where necessary to ensure consistency with any relevant standard drawn up by the European Committee for Standardisation (CEN).

The delegation of power referred to in the first paragraph shall not apply to the petrol vapour capture efficiency and vapour/petrol ratio specified in Article 4 and the time periods specified in Article 5.

Article 8a Exercise of the delegation
Article 10 Transposition
Article 11 Entry into force

Article 11

Entry into force

This Directive shall enter into force on the day of its publication in the Official Journal of the European Union.

Article 12 Addressees

Article 12

Addressees

This Directive is addressed to the Member States.

1.1 Referencer

1.2 Identificerede krav

1.3 Relaterede standarder

2. Identificerede krav

Krav
Kilde Krav

3. Relaterede standarder

Standarder
Kilde Krav

Linkede sager