+Article 16c 1.
|
Article 16c 1.
Where repowering of a renewable energy power plant does not result in an increase of the capacity of a renewable energy power plant beyond 15 %, and without prejudice to any assessment of potential environmental impact required pursuant to paragraph 2, Member States shall ensure that permit granting procedures for connections to the transmission or distribution grid shall not exceed three months following application to the relevant entity unless there are justified safety concerns or there is technical incompatibility of the system components.
1. Übersicht
| Bezeichnung |
Regulierung |
,
1.1 Referenzen
1.2 Identifizierte Anforderungen
1.3 Zugehörige Standards
2. Identifizierte Anforderungen
Anforderungen
| Quelle |
Anforderung |
3. Zugehörige Standards
Standards
| Quelle |
Anforderung |
- Builddate: 16.07.2024 00:00:00 -Doknr: CELEX:32018L2001
- EULAW -
EN: Legal acts of the European Union from EUR-Lex, https://eur-lex.europa.eu/. © European Union. Re-use is authorised by Decision 2011/833/EU, provided the source is acknowledged; the consolidated texts are licensed under CC BY 4.0 (EUR-Lex legal notice). Divided into sections and converted into the GRCA format, the wording unchanged. Only the legislation published in the Official Journal of the European Union is deemed authentic.
DE: Rechtsakte der Europäischen Union aus EUR-Lex, https://eur-lex.europa.eu/. © Europäische Union. Weiterverwendung nach Beschluss 2011/833/EU mit Quellenangabe gestattet; die konsolidierten Fassungen stehen unter CC BY 4.0 (Rechtlicher Hinweis von EUR-Lex). In Abschnitte aufgeteilt und in das GRCA-Format umgewandelt, der Wortlaut unverändert. Verbindlich sind allein die im Amtsblatt der Europäischen Union veröffentlichten Rechtsakte.
|