+Article 26 5.

Article 26 5.

Member States shall ensure that as from 1 January 2025, and every five years thereafter, operators of all existing district heating and cooling systems with a total heat and cold output exceeding 5 MW and which do not meet the criteria set out in paragraph 1, points (b) to (e), prepare a plan to ensure more efficient consumption of primary energy, to reduce distribution losses and to increase the share of renewable energy in heating and cooling supply. The plan shall include measures to meet the criteria set out in paragraph 1, points (b) to (e), and shall require approval by the competent authority.

1. Übersicht

,
Bezeichnung Regulierung

1.1 Referenzen

1.2 Identifizierte Anforderungen

1.3 Zugehörige Standards

2. Identifizierte Anforderungen

Anforderungen
Quelle Anforderung

3. Zugehörige Standards

Standards
Quelle Anforderung