+Article 26 8. |
Article 26 8.Member States may exempt from paragraph 7:
(a)
peak load and back-up electricity generating installations which are planned to operate under 1 500 operating hours per year as a rolling average over a period of five years, based on a verification procedure established by the Member States ensuring that this exemption criterion is met;
(b)
installations that need to be located close to a geological storage site approved under Directive 2009/31/EC;
(c)
data centres whose waste heat is or will be used in a district heating network or directly for space heating, domestic hot water preparation or other uses in the building or group of buildings or facilities where it is located. Member States may also lay down thresholds, expressed in terms of the amount of available useful waste heat, the demand for heat or the distances between industrial installations and district heating networks, for exempting individual installations from paragraph 7, points (c) and (d). Member States shall notify exemptions adopted under this paragraph to the Commission. 1. Übersicht
1.1 Referenzen1.2 Identifizierte Anforderungen1.3 Zugehörige Standards2. Identifizierte Anforderungen
3. Zugehörige Standards
|