+Article 5 6.

Article 5 6.

Before approving the terms and conditions or methodologies referred to in paragraphs 2 and 3, the regulatory authorities, or, where competent, ACER, shall revise them where necessary, after consulting the ENTSO for Electricity, the ENTSO for Gas or the EU DSO entity, in order to ensure that they are in line with the purpose of the network code or guideline and contribute to market integration, non-discrimination, effective competition and the proper functioning of the market. ACER shall take a decision on the approval within the period specified in the relevant network codes and guidelines. That period shall begin on the day following that on which the proposal was referred to ACER.

1. Επισκόπηση

,
Τίτλος Κανονισμός

1.1 Παραπομπές

1.2 Εντοπισμένες απαιτήσεις

1.3 Σχετικά πρότυπα

2. Εντοπισμένες απαιτήσεις

Απαιτήσεις
Πηγή Απαίτηση

3. Σχετικά πρότυπα

Πρότυπα
Πηγή Απαίτηση