+Article 50 6.

Article 50 6.

Generation undertakings which own or operate generation assets, where at least one generation asset has an installed capacity of at least 250 MW, or which have a portfolio comprising at least 400 MW of generation assets, shall keep at the disposal of the regulatory authority, the national competition authority and the Commission, for five years all hourly data per plant that is necessary to verify all operational dispatching decisions and the bidding behaviour at power exchanges, interconnection auctions, reserve markets and over-the-counter-markets. The per-plant and per hour information to be stored shall include, but shall not be limited to, data on available generation capacity and committed reserves, including allocation of those committed reserves on a per-plant level, at the times the bidding is carried out and when production takes place.

1. Επισκόπηση

,
Τίτλος Κανονισμός

1.1 Παραπομπές

1.2 Εντοπισμένες απαιτήσεις

1.3 Σχετικά πρότυπα

2. Εντοπισμένες απαιτήσεις

Απαιτήσεις
Πηγή Απαίτηση

3. Σχετικά πρότυπα

Πρότυπα
Πηγή Απαίτηση