+25. The following steps should form the core building blocks of the development and implementation …
|
25. The following steps should form the core building blocks of the development and implementation …
The following steps should form the core building blocks of the development and implementation of the NPE strategy: - a) assessment of the operating environment and external conditions (see section 4.2);
- b) development of the NPE strategy over short-, medium- and long-term time horizons (see section 4.3);
- c) implementation of the operational plan (see section 4.4);
- d) fully embedding the NPE strategy into the management processes of the credit institution, including regular review and independent monitoring (see section 4.5).
1. Overview
1.1 References
1.2 Identified Requirements
1.3 Related Standards
2. Identified Requirements
Requirements
| Source |
Requirement |
3. Related Standards
Standards
| Source |
Requirement |
- EBA -
EN: Guidelines and other publications of the European Banking Authority (EBA), https://www.eba.europa.eu/. © European Banking Authority. Reproduction is authorised provided the source is acknowledged (EBA legal notice). Divided into sections and converted into the GRCA format, the wording unchanged. Only the versions published by the EBA are authoritative.
DE: Leitlinien und weitere Veröffentlichungen der Europäischen Bankenaufsichtsbehörde (EBA), https://www.eba.europa.eu/. © European Banking Authority. Wiedergabe mit Quellenangabe gestattet (Rechtlicher Hinweis der EBA). In Abschnitte aufgeteilt und in das GRCA-Format umgewandelt, der Wortlaut unverändert. Maßgeblich sind allein die von der EBA veröffentlichten Fassungen.
|