+15. The recovery plan should be made up of all the following elements: a) The summary of the key …
|
15. The recovery plan should be made up of all the following elements: a) The summary of the key …
The recovery plan should be made up of all the following elements: - a) The summary of the key elements of the recovery plan, as further specified in Section 4.3 of these guidelines.
- b) Information on governance, including a framework of recovery plan indicators and monitoring thresholds, as further specified in Section 4.4 of these guidelines.
- c) The description of the applicable recovery options, including at least a recovery scenario analysis, a description of preparatory measures and information on the preservation of services as further specified in Section 4.5 of these guidelines.
- d) The recovery plan’s communication and disclosure plan, as further specified in Section 4.6 of these guidelines.
1. Overview
1.1 References
1.2 Identified Requirements
1.3 Related Standards
2. Identified Requirements
Requirements
| Source |
Requirement |
3. Related Standards
Standards
| Source |
Requirement |
- EBA -
EN: Guidelines and other publications of the European Banking Authority (EBA), https://www.eba.europa.eu/. © European Banking Authority. Reproduction is authorised provided the source is acknowledged (EBA legal notice). Divided into sections and converted into the GRCA format, the wording unchanged. Only the versions published by the EBA are authoritative.
DE: Leitlinien und weitere Veröffentlichungen der Europäischen Bankenaufsichtsbehörde (EBA), https://www.eba.europa.eu/. © European Banking Authority. Wiedergabe mit Quellenangabe gestattet (Rechtlicher Hinweis der EBA). In Abschnitte aufgeteilt und in das GRCA-Format umgewandelt, der Wortlaut unverändert. Maßgeblich sind allein die von der EBA veröffentlichten Fassungen.
|