NORMALISATION RULE FOR ACCOUNTING FOR ELECTRICITY GENERATED FROM HYDROPOWER AND WIND POWER
The following rule shall be applied for the purposes of accounting for electricity generated from hydropower in a given Member State:
►C1
◄ where:
|
N
|
=
|
reference year;
|
|
QN(norm)
|
=
|
normalised electricity generated by all hydropower plants of the Member State in year N, for accounting purposes;
|
|
Qi
|
=
|
the quantity of electricity actually generated in year i by all hydropower plants of the Member State measured in GWh, excluding production from pumped storage units using water that has previously been pumped uphill;
|
|
Ci
|
=
|
the total installed capacity, net of pumped storage, of all hydropower plants of the Member State at the end of year i, measured in MW.
|
The following rule shall be applied for the purposes of accounting for electricity generated from onshore wind power in a given Member State:
►C1
◄ where:
|
N
|
=
|
reference year;
|
|
QN(norm)
|
=
|
normalised electricity generated by all onshore wind power plants of the Member State in year N, for accounting purposes;
|
|
Qi
|
=
|
the quantity of electricity actually generated in year i by all onshore wind power plants of the Member State measured in GWh;
|
|
Cj
|
=
|
the total installed capacity of all the onshore wind power plants of the Member State at the end of year j, measured in MW;
|
|
n
|
=
|
4 or the number of years preceding year N for which capacity and production data are available for the Member State in question, whichever is lower.
|
The following rule shall be applied for the purposes of accounting for electricity generated from offshore wind power in a given Member State:
►C1
◄ where:
|
N
|
=
|
reference year;
|
|
QN(norm)
|
=
|
normalised electricity generated by all offshore wind power plants of the Member State in year N, for accounting purposes;
|
|
Qi
|
=
|
the quantity of electricity actually generated in year i by all offshore wind power plants of the Member State measured in GWh;
|
|
Cj
|
=
|
the total installed capacity of all the offshore wind power plants of the Member State at the end of year j, measured in MW;
|
|
n
|
=
|
4 or the number of years preceding year N for which capacity and production data are available for the Member State in question, whichever is lower.
|
1. Overview
1.1 References
1.2 Identified Requirements
1.3 Related Standards
2. Identified Requirements
Requirements
| Source |
Requirement |
3. Related Standards
Standards
| Source |
Requirement |
- Builddate: 16.07.2024 00:00:00 -Doknr: CELEX:32018L2001
- EULAW -
EN: Legal acts of the European Union from EUR-Lex, https://eur-lex.europa.eu/. © European Union. Re-use is authorised by Decision 2011/833/EU, provided the source is acknowledged; the consolidated texts are licensed under CC BY 4.0 (EUR-Lex legal notice). Divided into sections and converted into the GRCA format, the wording unchanged. Only the legislation published in the Official Journal of the European Union is deemed authentic.
DE: Rechtsakte der Europäischen Union aus EUR-Lex, https://eur-lex.europa.eu/. © Europäische Union. Weiterverwendung nach Beschluss 2011/833/EU mit Quellenangabe gestattet; die konsolidierten Fassungen stehen unter CC BY 4.0 (Rechtlicher Hinweis von EUR-Lex). In Abschnitte aufgeteilt und in das GRCA-Format umgewandelt, der Wortlaut unverändert. Verbindlich sind allein die im Amtsblatt der Europäischen Union veröffentlichten Rechtsakte.
|