+Article 18 1

Article 18 1

1.   In addition to carrying out other tasks set out in this Regulation, the ECG shall discuss:

(a)

the results of the 10-year network development plan in electricity prepared by the ENTSO for Electricity;

(b)

the coherence of the risk-preparedness plans, adopted by the competent authorities following the procedure referred to in Article 10;

(c)

the results of the European resource adequacy assessments carried out by the ENTSO for Electricity as referred to in Article 23(4) of Regulation (EU) 2019/943;

(d)

the performance of Member States in the area of security of electricity supply taking into account at least the indicators calculated in the European resource adequacy assessment, namely the expected energy non-served and loss of load expectation;

(e)

the results of the seasonal adequacy assessments referred to in Article 9(2);

(f)

the information received from the Member States pursuant to Article 7(4);

(g)

the results of the ex post evaluation referred to in Article 17(4);

(h)

the methodology for short-term adequacy assessment referred to in Article 8;

(i)

the methodology for identifying regional electricity crisis scenarios referred to in Article 5.

1. Overview

,
Summary Regulation

1.1 References

1.2 Identified Requirements

1.3 Related Standards

2. Identified Requirements

Requirements
Source Requirement

3. Related Standards

Standards
Source Requirement
  • Builddate: 14.06.2019 00:00:00 -Doknr: CELEX:32019R0941
  • EULAW -

    EN: Legal acts of the European Union from EUR-Lex, https://eur-lex.europa.eu/. © European Union. Re-use is authorised by Decision 2011/833/EU, provided the source is acknowledged; the consolidated texts are licensed under CC BY 4.0 (EUR-Lex legal notice). Divided into sections and converted into the GRCA format, the wording unchanged. Only the legislation published in the Official Journal of the European Union is deemed authentic.

    DE: Rechtsakte der Europäischen Union aus EUR-Lex, https://eur-lex.europa.eu/. © Europäische Union. Weiterverwendung nach Beschluss 2011/833/EU mit Quellenangabe gestattet; die konsolidierten Fassungen stehen unter CC BY 4.0 (Rechtlicher Hinweis von EUR-Lex). In Abschnitte aufgeteilt und in das GRCA-Format umgewandelt, der Wortlaut unverändert. Verbindlich sind allein die im Amtsblatt der Europäischen Union veröffentlichten Rechtsakte.