+Article 17 2.
|
Article 17 2.
Transmission system operators shall propose an appropriate structure for the allocation of cross-zonal capacity across timeframes, including day-ahead, intraday and balancing. That allocation structure shall be subject to review by the relevant regulatory authorities. In drawing up their proposal, the transmission system operators shall take into account:
(a)
the characteristics of the markets;
(b)
the operational conditions of the electricity system, such as the implications of netting firmly declared schedules;
(c)
the level of harmonisation of the percentages allocated to different timeframes and the timeframes adopted for the different cross-zonal capacity allocation mechanisms that are already in place.
1. Overview
1.1 References
1.2 Identified Requirements
1.3 Related Standards
2. Identified Requirements
Requirements
| Source |
Requirement |
3. Related Standards
Standards
| Source |
Requirement |
- Builddate: 16.07.2024 00:00:00 -Doknr: CELEX:32019R0943
- EULAW -
EN: Legal acts of the European Union from EUR-Lex, https://eur-lex.europa.eu/. © European Union. Re-use is authorised by Decision 2011/833/EU, provided the source is acknowledged; the consolidated texts are licensed under CC BY 4.0 (EUR-Lex legal notice). Divided into sections and converted into the GRCA format, the wording unchanged. Only the legislation published in the Official Journal of the European Union is deemed authentic.
DE: Rechtsakte der Europäischen Union aus EUR-Lex, https://eur-lex.europa.eu/. © Europäische Union. Weiterverwendung nach Beschluss 2011/833/EU mit Quellenangabe gestattet; die konsolidierten Fassungen stehen unter CC BY 4.0 (Rechtlicher Hinweis von EUR-Lex). In Abschnitte aufgeteilt und in das GRCA-Format umgewandelt, der Wortlaut unverändert. Verbindlich sind allein die im Amtsblatt der Europäischen Union veröffentlichten Rechtsakte.
|