+INF.11.A11 Replacement Arrangements in the Event of Breakdowns [Process Owner] (H)

INF.11.A11 Replacement Arrangements in the Event of Breakdowns [Process Owner] (H)

Preparatory safeguards SHOULD be taken within the organisation in question in case there is a problem with a driver or a vehicle. Depending on the importance of vehicles, replacement vehicles SHOULD be available. Alternatively, a framework agreement SHOULD be concluded with a suitable external organisation. Replacement drivers SHOULD also be available.

1. Overview

Summary Standard

1.1 References

1.2 Identified Requirements

1.3 Related Regulations

2. Identified Requirements

Requirements
Source Requirement

3. Related Regulations

Regulations
Source Regulation

Linked Issues

Issuelinks
Linktype Issue
blocks G 0.27 Lack of Resources