+253. The deferral period starts after the award is made (e.g. at the moment the upfront part of the …

253. The deferral period starts after the award is made (e.g. at the moment the upfront part of the …

The deferral period starts after the award is made (e.g. at the moment the upfront part of the variable remuneration is paid out). Deferral can be applied to both types of variable remuneration, cash and instruments.

1. Overview

,
Summary Regulation

1.1 References

1.2 Identified Requirements

1.3 Related Standards

2. Identified Requirements

Requirements
Source Requirement

3. Related Standards

Standards
Source Requirement
  • EBA - Published by the European Banking Authority at https://www.eba.europa.eu/