+253. The deferral period starts after the award is made (e.g. at the moment the upfront part of the …
|
253. The deferral period starts after the award is made (e.g. at the moment the upfront part of the …
The deferral period starts after the award is made (e.g. at the moment the upfront part of the variable remuneration is paid out). Deferral can be applied to both types of variable remuneration, cash and instruments.
1. Overview
1.1 References
1.2 Identified Requirements
1.3 Related Standards
2. Identified Requirements
Requirements
| Source |
Requirement |
3. Related Standards
Standards
| Source |
Requirement |
- EBA - Published by the European Banking Authority at https://www.eba.europa.eu/
|