+108. Institutions should document their plans including their methodologies, assumptions …
|
108. Institutions should document their plans including their methodologies, assumptions …
Institutions should document their plans including their methodologies, assumptions, cri-teria, targets and actions planned to reach targets, along with performed and scheduled revi-sions. Institutions should specify the scope of risks captured by each part of the plan, e.g. whether it applies to environmental, social or governance risks, and should ensure that all aspects of the plan address at least environmental risks. 42
1. Overview
1.1 References
1.2 Identified Requirements
1.3 Related Standards
2. Identified Requirements
Requirements
| Source |
Requirement |
3. Related Standards
Standards
| Source |
Requirement |
- EBA - Published by the European Banking Authority at https://www.eba.europa.eu/
|