+26. According to the time horizon of the analysis, institutions should consider potential risk …

26. According to the time horizon of the analysis, institutions should consider potential risk …

According to the time horizon of the analysis, institutions should consider potential risk mitigation or amplification factors. These may include:

  • a. private and public insurance coverage - while considering the existing and potential future insurance protection gaps;
  • b. counterparties’ ongoing efforts and forward-looking strategies related to climate change mitigation and/or adaptation (e.g. transition plans where available), including the risks stemming from a potential failure or delay in effectively undertaking such a transition/adaptation; and
  • c. relevant local or governmental adaptation measures, while being cautious not to rely on overly optimistic government actions or State-led financial support schemes.

1. Overview

,
Summary Regulation

1.1 References

1.2 Identified Requirements

1.3 Related Standards

2. Identified Requirements

Requirements
Source Requirement

3. Related Standards

Standards
Source Requirement
  • EBA - Published by the European Banking Authority at https://www.eba.europa.eu/