+Article 5 1.

Article 5 1.

Project promoters shall draw up an implementation plan for projects on the Union list, including a timetable for each of the following:

(a) 

feasibility and design studies including, as regards, climate adaptation and compliance with environmental legislation and with the doing ‘no significant harm’ principle;

(b) 

approval by the national regulatory authority or by any other authority concerned;

(c) 

construction and commissioning;

(d) 

the permit granting process referred to in Article 10(6), point (b).

1. Overview

,
Summary Regulation

1.1 References

1.2 Identified Requirements

1.3 Related Standards

2. Identified Requirements

Requirements
Source Requirement

3. Related Standards

Standards
Source Requirement