|
+Article 12 2. |
Article 12 2.A waste facility shall only start the closure procedure if one of the following conditions is satisfied:
(a)
the relevant conditions stated in the permit are met;
(b)
authorisation is granted by the competent authority, at the request of the operator;
(c)
the competent authority issues a reasoned decision to that effect. 1. Overview
1.1 References1.2 Identified Requirements1.3 Related Standards2. Identified Requirements
3. Related Standards
|