|
+Article 14 1 |
Article 14 11. The preliminary flood risk assessment, or the assessment and decisions referred to in Article 13(1), shall be reviewed, and if necessary updated, by 22 December 2018 and every six years thereafter. 1. Overview
1.1 References1.2 Identified Requirements1.3 Related Standards2. Identified Requirements
3. Related Standards
|