|
+Article 5 8. |
Article 5 8.Operators of recharging points shall ensure that all publicly accessible recharging points operated by them and built after 13 April 2024 or renovated after 14 October 2024 are capable of smart recharging.
1. Overview
1.1 References1.2 Identified Requirements1.3 Related Standards2. Identified Requirements
3. Related Standards
|