+Article 7 1.

Article 7 1.

Member States shall ensure that discharges from urban wastewater treatment plants treating urban wastewater with a load of 150 000 p.e. and above and not applying tertiary treatment on 1 January 2025 satisfy, before being discharged into receiving waters, the relevant requirements of tertiary treatment in accordance with Part B and Table 2 of Annex I by:

(a) 

31 December 2033 for discharges from 30 % of those urban wastewater treatment plants;

(b) 

31 December 2036 for discharges from 70 % of those urban wastewater treatment plants.

By 31 December 2039, Member States shall ensure that all discharges from urban wastewater treatment plants treating urban wastewater with a load of 150 000 p.e. and above satisfy, before being discharged into receiving waters, the relevant requirements of tertiary treatment referred to in Part B and Table 2 of Annex I.

1. Overview

,
Summary Regulation

1.1 References

1.2 Identified Requirements

1.3 Related Standards

2. Identified Requirements

Requirements
Source Requirement

3. Related Standards

Standards
Source Requirement