+3.2.6. To the extent feasible, the relevant entities shall ensure that all systems have …

3.2.6. To the extent feasible, the relevant entities shall ensure that all systems have …

3.2.6.

To the extent feasible, the relevant entities shall ensure that all systems have synchronised time sources to be able to correlate logs between systems for event assessment. The relevant entities shall establish and keep a list of all assets that are being logged and ensure that monitoring and logging systems are redundant. The availability of the monitoring and logging systems shall be monitored independent of the systems they are monitoring.

1. Overview

,
Summary Regulation

1.1 References

1.2 Identified Requirements

1.3 Related Standards

2. Identified Requirements

Requirements
Source Requirement

3. Related Standards

Standards
Source Requirement

Linked Issues