Gas and Electricity infrastructure projects
1. Gas interconnectors
|
Project
|
Location of projects supported
|
Envisaged Community contribution
(EUR million)
|
|
Southern Gas Corridor
|
|
NABUCCO
|
Austria, Hungary, Bulgaria, Germany, Romania
|
200
|
|
ITGI – Poseidon
|
Italy, Greece
|
100
|
|
Baltic interconnection
|
|
Skanled/Baltic pipe
|
Poland, Denmark, Sweden
|
150
|
|
LNG network
|
|
Liquefied Natural Gas terminal at Polish coast at port of Świnoujście
|
Poland
|
80
|
|
Central and South East Europe
|
|
Slovakia-Hungary Interconnector (Veľký Krtíš - Vecsés)
|
Slovakia, Hungary
|
30
|
|
Gas transmission system in Slovenia between the Austrian Border to Ljubljana (excluding the section Rogatec-Kidričevo)
|
Slovenia
|
40
|
|
Interconnection Bulgaria-Greece (Stara Zagora — Dimitrovgrad-Komotini)
|
Bulgaria, Greece
|
45
|
|
Romania-Hungary gas interconnector
|
Romania, Hungary
|
30
|
|
Expansion of Gas Storage Capacity in the Czech hub
|
Czech Republic
|
35
|
|
Infrastructure and equipment to permit reverse gas flow in the event of short term supply disruption
|
Austria, Bulgaria, Czech Republic, Estonia, Greece, Hungary, Latvia, Lithuania, Poland, Portugal, Romania, Slovakia
|
80
|
|
Slovakia-Poland interconnection
|
Slovakia, Poland
|
20
|
|
Hungary-Croatia interconnection
|
Hungary
|
20
|
|
Bulgaria-Romania interconnection
|
Bulgaria, Romania
|
10
|
|
Mediterranean
|
|
Reinforcement of FR gas network on the Africa-Spain-France axis
|
France
|
200
|
|
GALSI (Gazoduc Algérie-Italie)
|
Italy
|
120
|
|
Gas Interconnection Western Axis Larrau Branch
|
Spain
|
45
|
|
North Sea area
|
|
Germany-Belgium-United Kingdom pipeline
|
Belgium
|
35
|
|
France-Belgium connection
|
France, Belgium
|
200
|
|
TOTAL
|
|
1 440
|
2. Electricity interconnectors
|
Project
|
Location of projects supported
|
Envisaged Community contribution
(EUR million)
|
|
Baltic interconnection
|
|
Estlink-2
|
Estonia, Finland
|
100
|
|
Interconnection Sweden-Baltic States, and strengthening of the grid in Baltic States
|
Sweden, Latvia, Lithuania
|
175
|
|
Central and South East Europe
|
|
Halle/Saale – Schweinfurt
|
Germany
|
100
|
|
Wien-Győr
|
Austria, Hungary
|
20
|
|
Mediterranean
|
|
Portugal-Spain interconnection reinforcement
|
Portugal
|
50
|
|
Interconnection France-Spain (Baixas - Sta Llogaia)
|
France, Spain
|
225
|
|
New 380 kV AC submarine cable between Sicily – Continental Italy (Sorgente – Rizziconi)
|
Italy
|
110
|
|
North Sea area
|
|
500 MW Ireland/Wales interconnector (Meath-Deeside)
|
Ireland, United Kingdom
|
110
|
|
Electricity interconnection Malta-Italy
|
Malta/Italy
|
20
|
|
TOTAL
|
|
910
|
3. Small island projects
|
Small isolated island initiatives
|
Cyprus
|
10
|
|
Malta
|
5
|
|
TOTAL
|
|
15
|
B.
Offshore wind projects
|
Project
|
Capacity
|
Location of projects supported
|
Envisaged Community contribution
(EUR million)
|
|
1. Grid integration of offshore wind energy
|
|
1.1. Baltic – Kriegers Flak I, II, III
Building on projects under development. Financing aimed at ensuring extra cost for securing a joint interconnection solution.
|
1,5 GW
|
Denmark, Sweden, Germany, Poland
|
150
|
|
1.2. North sea grid
Modular development of offshore grid, demonstration of virtual offshore power plant and integration in the existing onshore grid system.
|
1 GW
|
United Kingdom, Netherlands, Germany, Ireland, Denmark, Belgium, France, Luxembourg
|
165
|
|
2. New turbines, structures and components, optimisation of manufacturing capacities
|
|
2.1. Borkum West II – Bard 1 – Nordsee Ost – Global Tech I
New generation of multi-megawatt size turbines (5-7 MW) and innovative structures, situated far from shore (up to 100 km) in deeper waters (up to 40 m).
|
1,6 GW
|
Germany
|
200
|
|
2.2. Aberdeen offshore wind farm (European testing centre)
Building on project presently under development – testing of multi-MW turbines. Development of innovative structures and substructures including optimisation of manufacturing capacities of offshore wind energy production equipment. An increase in size of 100 MW can be envisaged.
|
0,25 GW
|
United Kingdom
|
40
|
|
2.3. Thornton Bank
Building on project presently under development. Learning from the Downvind project (cofinanced through FP6). Upscaling the Downvind installations turbines (5 MW size) in deep waters (up to 30 m) with low visual impact (up to 30 km).
|
90 MW
|
Belgium
|
10
|
|
TOTAL
|
|
|
565
|
C.
Carbon capture and storage projects
|
Project Name/Location
|
Envisaged Community contribution
(EUR million)
|
Fuel
|
Capacity
|
Capture Technique
|
Storage Concept
|
|
Huerth
|
Germany
|
180
|
Coal
|
450 MW
|
IGCC
|
Saline Aquifer
|
|
Jaenschwalde
|
|
|
Coal
|
500 MW
|
Oxyfuel
|
Oil/Gas fields
|
|
Eemshaven
|
Netherlands
|
180
|
Coal
|
1 200 MW
|
IGCC
|
Oil/Gas fields
|
|
Rotterdam
|
Coal
|
1 080 MW
|
PC
|
Oil/Gas fields
|
|
Rotterdam
|
Coal
|
800 MW
|
PC
|
Oil/Gas fields
|
|
Bełchatów
|
Poland
|
180
|
Coal
|
858 MW
|
PC
|
Saline Aquifer
|
|
Compostilla
(León)
|
Spain
|
180
|
Coal
|
500 MW
|
Oxyfuel
|
Saline Aquifer
|
|
Kingsnorth
|
United Kingdom
|
180
|
Coal
|
800 MW
|
PC
|
Oil/Gas fields
|
|
Longannet
|
Coal
|
3 390 MW
|
PC
|
Saline Aquifer
|
|
Tilbury
|
Coal
|
1 600 MW
|
PC
|
Oil/Gas fields
|
|
Hatfield
(Yorkshire)
|
Coal
|
900 MW
|
IGCC
|
Oil/Gas fields
|
|
Porto Tolle
|
Italy
|
100
|
Coal
|
660 MW
|
PC
|
|
|
Industrial carbon capture project
|
|
Florange
|
France
|
50
|
Transport of CO2 from industrial installation (steel plant) to underground storage (saline aquifer)
|
|
TOTAL
|
1 050
|
1. Resumen
1.1 Referencias
1.2 Requisitos identificados
1.3 Estándares relacionados
2. Requisitos identificados
Requisitos
| Fuente |
Requisito |
3. Estándares relacionados
Estándares
| Fuente |
Requisito |
|