+Article 6a 1.

Article 6a 1.

The regulatory authority or another competent authority where a Member State has so provided shall develop a framework for transmission system operators and distribution system operators to offer the possibility of establishing flexible connection agreements in areas where there is limited or no network capacity availability for new connections as published in accordance with Article 31(3) of this Directive and Article 50(4a), first subparagraph, of Regulation (EU) 2019/943. That framework shall ensure that:
(a) 

as a general rule, flexible connections do not delay the network reinforcements in the identified areas;

(b) 

a conversion from flexible to firm connection agreements once the network is developed is ensured on the basis of established criteria; and

(c) 

for areas where the regulatory authority or another competent authority where a Member State has so provided, deems network development not to be the most efficient solution, enable, where relevant, flexible connection agreements as a permanent solution, including for energy storage.

1. Resumen

,
Título Regulación

1.1 Referencias

1.2 Requisitos identificados

1.3 Estándares relacionados

2. Requisitos identificados

Requisitos
Fuente Requisito

3. Estándares relacionados

Estándares
Fuente Requisito