+Article 53 2.

Article 53 2.

By 5 July 2020, the distribution system operators shall submit to the Commission and to ACER, the draft statutes, in accordance with Article 54, including a code of conduct, a list of registered members, the draft rules of procedure, including the rules of procedures on the consultation with the ENTSO for Electricity and other stakeholders and the financing rules, of the EU DSO entity to be established.

The draft rules of procedure of the EU DSO entity shall ensure balanced representation of all participating distribution system operators.

1. Resumen

,
Título Regulación

1.1 Referencias

1.2 Requisitos identificados

1.3 Estándares relacionados

2. Requisitos identificados

Requisitos
Fuente Requisito

3. Estándares relacionados

Estándares
Fuente Requisito