+Section 3 Transmission, natural gas storage, LNG and hydrogen terminal system operation
---+Article 20 Firm capacity for renewable gas and low-carbon gas to the transmission system
------+Article 20 1
------+Article 20 2
---+Article 21 Cross-border coordination with regard to gas quality in the natural gas system
------+Article 21 1
------+Article 21 2
------+Article 21 3
------+Article 21 4
------+Article 21 5
------+Article 21 6
------+Article 21 7
------+Article 21 8
------+Article 21 9
------+Article 21 10
------+Article 21 11
------+Article 21 12
------+Article 21 13
------+Article 21 14
---+Article 22 Presumption of conformity of practices with harmonised standards for natural gas
---+Article 23 Common specifications for biomethane
------+Article 23 1
------+Article 23 2
------+Article 23 3
------+Article 23 4
------+Article 23 5
---+Article 24 European network of transmission system operators for gas
---+Article 25 Organisation of the ENTSO for Gas
------+Article 25 1
------+Article 25 2
------+Article 25 3
------+Article 25 4
---+Article 26 Tasks of the ENTSO for Gas
------+Article 26 1
------+Article 26 2
------+Article 26 3
------+Article 26 4
------+Article 26 5
------+Article 26 6
------+Article 26 7
------+Article 26 8
------+Article 26 9
------+Article 26 10
------+Article 26 11
---+Article 27 ACER’s monitoring of the ENTSO for Gas
------+Article 27 1
------+Article 27 2
---+Article 28 Regulatory authorities
---+Article 29 Consultations by the ENTSO for Gas
------+Article 29 1
------+Article 29 2
------+Article 29 3
---+Article 30 Costs of the ENTSO for Gas
---+Article 31 Regional cooperation of transmission system operators
------+Article 31 1
------+Article 31 2
------+Article 31 3
---+Article 32 Union-wide network development plan for natural gas
------+Article 32 2
------+Article 32 (a)
------+Article 32 (b)
------+Article 32 (c)
------+Article 32 3
---+Article 33 Transparency requirements concerning transmission system operators
------+Article 33 1
------+Article 33 2
------+Article 33 3
------+Article 33 4
------+Article 33 5
------+Article 33 6
------+Article 33 7
---+Article 34 Transparency requirements concerning natural gas storage facilities, hydrogen storage facilities, LNG facilities and hydrogen terminals
------+Article 34 1
------+Article 34 2
------+Article 34 3
------+Article 34 4
------+Article 34 5
------+Article 34 6
---+Article 35 Record keeping by system operators
|
Section 3 Transmission, natural gas storage, LNG and hydrogen terminal system operation
Section 3 Transmission, natural gas storage, LNG and hydrogen terminal system operation
1. Resumen
| Título |
Regulación |
|
Article 20 Firm capacity for renewable gas and low-carbon gas to the transmission system
|
|
|
Article 21 Cross-border coordination with regard to gas quality in the natural gas system
|
|
|
Article 22 Presumption of conformity of practices with harmonised standards for natural gas
|
Article 22
Presumption of conformity of practices with harmonised standards for natural gas
Practices which are in conformity with harmonised standards, or parts thereof, the references of which have been published in the Official Journal of the European Union shall be presumed to be in conformity with the requirements laid down in implementing acts adopted pursuant to Article 71(2), first subparagraph, point (a).
|
|
Article 23 Common specifications for biomethane
|
|
|
Article 24 European network of transmission system operators for gas
|
Article 24
European network of transmission system operators for gas
All transmission system operators shall cooperate at Union level through the ENTSO for Gas, in order to promote the completion and proper functioning of the internal market for natural gas and cross-border trade and to ensure the optimal management, coordinated operation and sound technical evolution of the natural gas transmission network.
|
|
Article 25 Organisation of the ENTSO for Gas
|
|
|
Article 26 Tasks of the ENTSO for Gas
|
|
|
Article 27 ACER’s monitoring of the ENTSO for Gas
|
|
|
Article 28 Regulatory authorities
|
Article 28
When carrying out their duties and exercising their powers under this Regulation, the regulatory authorities shall ensure compliance with this Regulation, the network codes and the guidelines adopted pursuant to Articles 70 to 74.
Where appropriate, they shall cooperate with each other, with the Commission and ACER pursuant to Chapter V of Directive (EU) 2024/1788.
|
|
Article 29 Consultations by the ENTSO for Gas
|
|
|
Article 30 Costs of the ENTSO for Gas
|
Article 30
Costs of the ENTSO for Gas
The costs related to the activities of the ENTSO for Gas referred to in Articles 24, 25, 26, 70 and 71 of this Regulation, and in Article 11 of Regulation (EU) 2022/869, shall be borne by the transmission system operators and shall be taken into account in the calculation of tariffs. Regulatory authorities shall approve those costs provided that they are reasonable and appropriate.
|
|
Article 31 Regional cooperation of transmission system operators
|
|
|
Article 32 Union-wide network development plan for natural gas
|
The ENTSO for Gas shall adopt and publish the Union-wide network development plan for natural gas every two years. The Union-wide network development plan for natural gas shall include the modelling of the integrated network, scenario development, a European supply adequacy outlook and an assessment of the resilience of the system, including infrastructure to be decommissioned.
|
|
Article 33 Transparency requirements concerning transmission system operators
|
|
|
Article 34 Transparency requirements concerning natural gas storage facilities, hydrogen storage facilities, LNG facilities and hydrogen terminals
|
|
|
Article 35 Record keeping by system operators
|
Article 35
Record keeping by system operators
Transmission system operators, natural gas storage system operators and LNG system operators shall keep at the disposal of the national authorities, including the regulatory authorities and the national competition authorities, and the Commission, all information referred to in Articles 33 and 34 and in point 3 of Annex I for a period of five years.
|
,
1.1 Referencias
1.2 Requisitos identificados
1.3 Estándares relacionados
2. Requisitos identificados
Requisitos
| Fuente |
Requisito |
3. Estándares relacionados
Estándares
| Fuente |
Requisito |
|