+1. Relevant points shall include at least: (a) all entry and exit points to and from a transmission …
|
1. Relevant points shall include at least: (a) all entry and exit points to and from a transmission …
|
1.
|
Relevant points shall include at least:
|
(a)
|
all entry and exit points to and from a transmission network operated by a transmission system operator, with the exception of exit points connected to a single final customer, and with the exception of entry points linked directly to a production facility of a single producer that is located within the Union;
|
|
(b)
|
all entry and exit points connecting balancing zones of transmission system operators;
|
|
(c)
|
all points connecting the network of a transmission system operator with an LNG terminal, physical natural gas hubs, storage and production facilities, unless these production facilities are exempted under point (a);
|
|
(d)
|
all points connecting the network of a given transmission system operator to infrastructure necessary for providing ancillary services.
|
|
1. Resumen
1.1 Referencias
1.2 Requisitos identificados
1.3 Estándares relacionados
2. Requisitos identificados
Requisitos
| Fuente |
Requisito |
3. Estándares relacionados
Estándares
| Fuente |
Requisito |
|