+Article 7 3.

Article 7 3.

The competent authority shall only grant a permit if it is satisfied that:

(a) 

the operator complies with the relevant requirements under this Directive;

(b) 

the management of waste does not conflict directly or otherwise interfere with the implementation of the relevant waste management plan or plans referred to in Article 7 of Directive 75/442/EEC.

1. Ülevaade

,
Pealkiri Regulatsioon

1.1 Viited

1.2 Tuvastatud nõuded

1.3 Seotud standardid

2. Tuvastatud nõuded

Nõuded
Allikas Nõue

3. Seotud standardid

Standardid
Allikas Nõue