|
+Article 6 1. |
Article 6 1.All shipments of waste for which notification is required shall be subject to the requirement of a financial guarantee or equivalent insurance covering:
(a)
costs of transport;
(b)
costs of recovery or disposal, including any necessary interim operation; and
(c)
costs of storage for 90 days. 1. Ülevaade
1.1 Viited1.2 Tuvastatud nõuded1.3 Seotud standardid2. Tuvastatud nõuded
3. Seotud standardid
|