+Article 8 2

Article 8 2

2.   The MAPP shall be drawn up and, where required by national law, sent to the competent authority within the following time-limits:

(a)

for new establishments, a reasonable period of time prior to the start of construction or operation, or prior to the modifications leading to a change in the inventory of dangerous substances;

(b)

for all other cases, one year from the date from which this Directive applies to the establishment concerned.

1. Ülevaade

,
Pealkiri Regulatsioon

1.1 Viited

1.2 Tuvastatud nõuded

1.3 Seotud standardid

2. Tuvastatud nõuded

Nõuded
Allikas Nõue

3. Seotud standardid

Standardid
Allikas Nõue