|
+Article 16e 1. |
Article 16e 1.Member States shall ensure that the permit-granting procedure for the installation of heat pumps below 50 MW shall not exceed one month. However, in the case of ground source heat pumps, the permit-granting procedure shall not exceed three months.
1. Ülevaade
1.1 Viited1.2 Tuvastatud nõuded1.3 Seotud standardid2. Tuvastatud nõuded
3. Seotud standardid
|