|
+Article 5 6 |
Article 5 66. Within two months of receipt of the proposed methodology, ACER shall, after consulting the ECG, in its formation composed only of representatives of the Member States, approve or amend the proposal. The ENTSO for Electricity and ACER shall publish the final version of the methodology on their websites. 1. Ülevaade
1.1 Viited1.2 Tuvastatud nõuded1.3 Seotud standardid2. Tuvastatud nõuded
3. Seotud standardid
|