|
+Article 37 5. |
Article 37 5.For the tasks set out in this Article and not already covered by the relevant network codes or guidelines, the ENTSO for Electricity shall develop a proposal in accordance with the procedure set out in Article 27. Regional coordination centres shall carry out those tasks on the basis of the proposal following its approval by ACER.
1. Ülevaade
1.1 Viited1.2 Tuvastatud nõuded1.3 Seotud standardid2. Tuvastatud nõuded
3. Seotud standardid
|