+Article 42 1.

Article 42 1.

The transmission system operators in a system operation region shall develop a procedure for the adoption and revision of coordinated actions and recommendations issued by regional coordination centres in accordance with the criteria set out in paragraphs 2, 3, and 4.

1. Ülevaade

,
Pealkiri Regulatsioon

1.1 Viited

1.2 Tuvastatud nõuded

1.3 Seotud standardid

2. Tuvastatud nõuded

Nõuded
Allikas Nõue

3. Seotud standardid

Standardid
Allikas Nõue