|
+Article 19 6 |
Article 19 66. If a concession contract is not awarded, the Commission shall ensure an optimal implementation of the objective referred to in Article 3(1), point (a), by procuring, as appropriate, a supply, service or works contract or a mixed contract. 1. Ülevaade
1.1 Viited1.2 Tuvastatud nõuded1.3 Seotud standardid2. Tuvastatud nõuded
3. Seotud standardid
|