+Article 27 1.

Article 27 1.

Operators obliged to draw up waste management plans in accordance with Article 5 of Directive 2006/21/EC shall provide to the competent authority as defined in Article 3, point (27), of that Directive a preliminary economic assessment study regarding the potential recovery of critical raw materials, from:

(a) 

the extractive waste stored in the facility; and

(b) 

the extractive waste being generated or, where considered more effective, from the extracted volume prior to it becoming waste.

Operators shall be exempt from the obligation laid down in the first subparagraph of this paragraph where they can demonstrate to the competent authority as defined in Article 3, point (27), of Directive 2006/21/EC, with a high degree of certainty, that the extractive waste does not contain critical raw materials that are technically recoverable.

1. Ülevaade

,
Pealkiri Regulatsioon

1.1 Viited

1.2 Tuvastatud nõuded

1.3 Seotud standardid

2. Tuvastatud nõuded

Nõuded
Allikas Nõue

3. Seotud standardid

Standardid
Allikas Nõue