+Article 2 (8)

Article 2 (8)

‘air traffic flow management’ or ‘ATFM’ means a function established with the objective of contributing to a safe, orderly and expeditious flow of air traffic covering the full trajectory by ensuring that ATC capacity is utilised to the maximum extent possible, and that the traffic volume is compatible with the capacities declared by the appropriate air traffic service providers;

1. Ülevaade

,
Pealkiri Regulatsioon

1.1 Viited

1.2 Tuvastatud nõuded

1.3 Seotud standardid

2. Tuvastatud nõuded

Nõuded
Allikas Nõue

3. Seotud standardid

Standardid
Allikas Nõue