+INF.5.A10 Maintenance of Air Temperature and Humidity [Building Services] (S)
|
INF.5.A10 Maintenance of Air Temperature and Humidity [Building Services] (S)
It SHOULD be ensured that the air temperature and humidity in a room for technical infrastructure are within the limits specified on the data sheets of the equipment operated in the room. A suitable ventilation and air-conditioning system SHOULD be used for this purpose. This system SHOULD have sufficient capacity.
1. Yleiskatsaus
1.1 Viittaukset
1.2 Tunnistetut vaatimukset
1.3 Liittyvät säädökset
2. Tunnistetut vaatimukset
Vaatimukset
| Lähde |
Vaatimus |
3. Liittyvät säädökset
Linkitetyt tehtävät
|